Laserfiche WebLink
INSPECTION REPORT'` <br /> Date Permit: <br /> Contractor: �l <br /> Owner: Oki bo J <br /> Site Address: 400 <br /> TYPE OF IINdPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Groun ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> i ing Grid ❑Drywall Nailing ❑Plumbing Final <br /> Electrical Final Shear Nailing GAS PIPE <br /> ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION 11111 <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Inspector: 66 Date: <br /> EIR(10/06) DAIABAR,INC. <br />