Laserfiche WebLink
r <br /> i <br /> T�L <br /> 1. The occupancy for the existing and new construction is described on the project <br /> criteria on sheet Al. <br /> Construction <br /> 1. Please refer to the wall type on sheet A2 and the building section on sheet A3. <br /> I have also included a specification page from Cemco Viper Studs demonstrating <br /> the load specifications for the steel wall studs and steel ceiling joists. <br /> 2. A detail has been provided showing the compliance of the ceiling system <br /> construction and support per the Northwest wall and Ceiling Bureau and the <br /> 2012 IBC Section 808. Please refer to sheet A3 detail 1 for the seismic bracing <br /> requirement for the A.C.T. ceiling. <br /> 3. Please refer to the door schedule describing the door type and hardware. <br /> 4. The building has an existing 3'-0" x 7'-0" storefront door which will serve as the <br /> ADA entry to the office. <br /> Additional Comments <br /> 1. The mechanical, plumbing, fire sprinkler, fire alarm and electrical permits have <br /> been listed as deferred submittals and will need separate permits. <br /> Sincerely <br /> Ross Jameson <br /> 2812 Architecture <br /> 2812 Colby Avenue Everett WA 98201 <br /> P (425)252-2153 F (425)742-8130 www.2812architecture.com �� <br />