Laserfiche WebLink
INSPECTION REPORT 220e <br /> Date: , Permit: <br /> Contractor: <br /> Owner: <br /> Site Address: dmff?",ftA�L MW <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑ Groundwork/Slab ❑ Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑ Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑ OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑ Mechanical Final ❑ Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OT ER OR CONSULTATION: <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS MIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector Date: rr� <br /> EIR(4109) 2 Nam 425/488-8900 <br />