Laserfiche WebLink
INSPECTION REPORT <br /> Date-. l Permit. <br /> g#M7T <br /> Contractor: <br /> G- 'T� (07-2 �D7 ] <br /> l O N <br /> Owner: Ft <br /> Site Address: 0 C,kA <br /> f AA-) WaLl <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑ Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑ Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑ OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑ Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> teetrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final C❑Gas PipeFinal <br /> �❑IHWT Final <br /> OTHER OR CONSULTATION <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspecto . DaVIO <br /> EIR(4/09) OMOTIONS• 421,/4R8-11900 <br />