Laserfiche WebLink
CITY OF EVERETT PUBLIC WORKS <br /> SPECIAL PROVISIONS <br /> ARTICLE 5 PROGRESS AND COMPLETION 21 <br /> 5.1 Notice to Proceed 21 <br /> 5.2 Contract Time 21 <br /> 5.3 Suspension Procedures 24 <br /> 5.4 Termination Procedures 25 <br /> 5.5 Possession and Use of Completed Portions of the Work 27 <br /> 5.6 Possession of Incomplete Portions of the Project 27 <br /> 5.7 Substantial Completion 28 <br /> 5.8 Acceptance of Work 28 <br /> ARTICLE 6 CHANGES 29 <br /> 6.1 Owner's Right to Direct Changes to the Work 29 <br /> 6.2 Extra Work 29 <br /> 6.3 Change Orders 29 <br /> 6.4 Value Engineering and Cost Sharing 30 <br /> ARTICLE 7 LABOR STANDARDS 30 <br /> 7.1 Wages of Employees 30 <br /> 7.2 Payment Certificates 31 <br /> 7.3 Hours of Labor 32 <br /> 7.4 Contract Work Hours 32 <br /> 7.5 Overtime Work 32 <br /> 7.6 Labor Relations 32 <br /> ARTICLE 8 MATERIAL, EQUIPMENT,WORKMANSHIP AND CONSTRUCTION UTILITIES33 <br /> 8.1 General 33 <br /> 8.2 Product Data 33 <br /> 8.3 Quality 33 <br /> 8.4 Material and Equipment Specified by Name 34 <br /> 8.5 Requests for Substitution 34 <br /> 8.6 Demonstration of Compliance with Contract Requirements 34 <br /> 8.7 Defective Work 36 <br /> 8.8 Materials and Equipment Furnished by Owner 37 <br /> 8.9 Guarantee 37 <br /> 8.10 Correction Period 38 <br /> ARTICLE 9 MEASUREMENT AND PAYMENT 39 <br /> 9.1 Payments to Contractor 39 <br /> 9.2 Payment for Changes 42 <br /> 9.3 Charges to Contractor 44 <br /> 9.4 Compensation to Owner for Time Extension 44 <br /> 9.5 Adjustment of Contract Sum 44 <br /> 9.6 Unabsorbed and Extended Overhead 45 <br /> WFP Operations Building Seismic Retrofit-Rebid January 6, 2017 <br /> WO#UP3600 007213 -2 <br />