Laserfiche WebLink
ARTICLE 4 CONTRACTOR <br /> 4.1 Contractor's Representative <br /> A. The Contractor shall notify the Owner in writing of the name of the person who will act as the <br /> Contractor's representative and shall have the authority to act in matter relating to this Contract. <br /> This person shall have authority to carry out the provisions of the Contract and to supply <br /> materials,Equipment,tools and labor without delay for the performance of the Work. <br /> B. Contractor shall employ and keep on Site on a full time basis personnel experienced in the <br /> management of construction of projects of this size and type. These shall include, but not be <br /> limited to, a project manager and superintendent. Neither the Contractor's project manager nor <br /> the superintendent shall have supervisory responsibility for other Projects for the Contractor <br /> while assigned to this Project. Contractor shall employ and assign such additional, full time <br /> office, support and engineering personnel to support the project manager and superintendent and <br /> allow timely completion of the Project. The project manager and superintendent must be <br /> approved by the Owner, and such approval shall not be unreasonably withheld. Contractor <br /> acknowledges that one of the instances in which it will be reasonable for the Owner to withhold <br /> consent is if the project manager or superintendent is different than as stated in the Bidder <br /> Qualification Statement. Contractor shall submit personnel qualifications within ten (10) days of <br /> Contractor's execution of the Contract. Bases for disapproval include,but are not limited to, lack <br /> of sufficient experience managing the construction of similar type or size projects or relationships <br /> on other projects unsatisfactory to the Owner. Owner may require removal and replacement of <br /> Contractor's supervisory staff who are disruptive or who appear to lack sufficient competence to <br /> complete the Project successfully. <br /> 4.2 Construction Procedures <br /> A. The Contractor shall supervise and direct the Work and determine the means, methods, <br /> techniques, sequences and procedures of construction,except in those instances where the Owner, <br /> to define the quality of an item of Work, specifies in the Contract, a means, method, technique, <br /> sequence or procedure for construction of that item of Work. <br /> 4.3 Subcontractors <br /> A. Unless explicitly specified elsewhere in the Contract Documents or expressly authorized in <br /> writing by the Owner before Contractor submits its Bid,the Contractor shall perform with its own <br /> organization at least one-third of the Work by dollar volume and Contractor shall not sublet to a <br /> single Subcontractor more than one-half of the Project. A Subcontractor of the Contractor shall <br /> not sublet to another Subcontractor more than one-half of its work without the written consent of <br /> the Owner obtained within twenty (20) days of award of the Contract to the Contractor. The <br /> Owner may refuse to approve such subcontract for any reason. Only unit price and Schedule of <br /> Value items of the Contract will be used in computing the total Work. The Owner may, at its sole <br /> option,refuse to approve a Subcontractor that is also providing services to the Owner on the same <br /> project. <br /> B. Subcontractors will be considered agents of the Contractor and their work shall be subject to the <br /> provisions of the Contract. References in the Contract Documents to actions required of <br /> Subcontractors, manufacturers, Suppliers, or persons other than the Contractor, the Owner or the <br /> WFP Operations Building Seismic Retrofit-Rebid January 6, 2017 <br /> WO#UP3600 007213 - 16 <br />