My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kassel & Associates 3/28/2017
>
Contracts
>
Capital Contract
>
Kassel & Associates 3/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:33:03 AM
Creation date
4/11/2017 3:25:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kassel & Associates
Approval Date
3/28/2017
Council Approval Date
2/15/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Kassel & Associates
Public Works WO Number
UP3600
Tracking Number
0000567
Total Compensation
$756,942.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kassel & Associates 3/21/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 7/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 9/29/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Pursuant to the requirements of Chapter 39.12 RCW, the Contractor and each Subcontractor <br /> or other person doing the whole or any part of Work to be performed under this Contract in <br /> the State of Washington shall pay each employee working in the State of Washington an <br /> amount not less than the general prevailing rate of wage, as specified by the Industrial <br /> Statistician of the Department of Labor and Industries of Washington State, paid in the <br /> vicinity of the Work to be performed under this Contract for the particular grade or <br /> occupation of each employee. <br /> 2. Any employee whose type of work is not covered by any of the classified wage rates <br /> specified by the Industrial Statistician shall be paid not less than the rate of wage listed for <br /> the classification that most nearly corresponds to the type of work performed. <br /> 3. In case any Dispute arises as to what are the prevailing rates of wages for work of a similar <br /> nature that cannot be adjusted by the parties in interest, including labor and management <br /> representatives, the matter shall be referred for arbitration to the Director of the Department <br /> of Labor and Industries of the State of Washington, and his or her decision therein shall be <br /> final and conclusive and binding on all parties involved in the Dispute. The schedule of <br /> prevailing wage rates as determined by the Industrial Statistician for the locality or localities <br /> where this Contract will be performed are by this reference made a part of this Contract as <br /> though fully set forth herein. The Contractor shall be held responsible for notifying its <br /> Subcontractors of these wage requirements. Failure by either the Contractor or any <br /> Subcontractors to comply with requirements of Chapter 39.12 RCW will result in delay of <br /> payment to the Contractor and/or imposition of other sanctions as may be available under the <br /> law and this Contract. <br /> B. Contractor's Responsibility <br /> 1. The Contractor will be held responsible for paying not less than the prevailing wages, <br /> including increases in such wages, over the term of this agreement. It is, therefore, <br /> imperative that the Contractor and its Subcontractors familiarize themselves with the wage <br /> rates before submitting bids based upon these Specifications. <br /> C. Federal Labor Requirements <br /> 1. Contractor shall comply with applicable federal laws and regulations relating to workers, <br /> safety and labor. <br /> 7.2 Payment Certificates <br /> A. The Contractor and each Subcontractor on or before the date of commencement of the Work shall <br /> file a statement of "Intent to Pay" prevailing wages under oath with the Owner and with the <br /> Washington State Department of Labor and Industries certifying the rate of hourly wage <br /> including the usual benefits paid and to be paid each classification of laborers, workmen, or <br /> mechanics employed upon the Work by the Contractor or its Subcontractor that shall not be less <br /> than the prevailing rate of wage. No payment will be made to the Contractor prior to the <br /> submission of such statements and the issuance by the Industrial Statistician of said Department <br /> of an acknowledgment of approval. Such statement and any supplemental statements that may be <br /> necessary shall be filed in accordance with the practices and procedures required by the <br /> Department of Labor and Industries. Upon the completion of the Work, the Contractor and all of <br /> its Subcontractors shall submit affidavits of wages paid to the Department of Labor and Industries <br /> in such form as may be required by said Department. Payment of the retained percentage will not <br /> be made until certification is received from the Department of Labor and Industries that the <br /> prevailing wage requirements of state law have been satisfied. <br /> WFP Operations Building Seismic Retrofit-Rebid January 6,2017 <br /> WO#UP3600 007213 -31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.