Kassel & Associates 3/28/2017
>
Contracts
>
Capital Contract
>
Kassel & Associates 3/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:33:03 AM
Creation date
4/11/2017 3:25:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kassel & Associates
Approval Date
3/28/2017
Council Approval Date
2/15/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Kassel & Associates
Public Works WO Number
UP3600
Tracking Number
0000567
Total Compensation
$756,942.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kassel & Associates 3/21/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 7/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 9/29/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a) The Owner solely caused a delay to the Completion Date as measured by <br /> analysis of the project duration by the critical path method pursuant to <br /> 5.2.C. Extensions of Contract Time; <br /> b) Because of such Delay, the Contractor was forced to suspend or <br /> significantly interrupt its performance so that it was on standby or idled, and <br /> the Owner required the Contractor to be ready to resume performance on <br /> short notice. Extended time of performance of Work, such as extensions <br /> caused by changes, inefficiencies, or Extra Work, does not constitute <br /> suspension or significant interruption of performance. <br /> c) The Contractor could not and did not use resources, including but not <br /> limited to labor,materials and equipment, standing by or idled on this or any <br /> other project for any work during the period of delay; <br /> d) The Contractor's Overhead costs did not materially vary from its usual <br /> seasonal Overhead costs during the period of delay; and <br /> e) The Delay did not cause Overabsorbed Overhead in the period in which the <br /> delayed Work was completed. <br /> 2) Resources <br /> a) To demonstrate the Contractor could not and did not use resources, <br /> including but not limited to labor, materials and equipment from this Project <br /> for any other work on this or any other project during the period of delay <br /> (12.4.C.5.b.1)c).), the Contractor must: <br /> i) Affirmatively represent and warrant that it did not perform substitute <br /> Work; <br /> ii) Identify the specific resources that were idled; and <br /> iii)Show that those resources did not, and could not, work on other contracts <br /> or projects during the Delay. <br /> b) No Material Variations <br /> i) To demonstrate the Contractor's Overhead costs did not materially vary <br /> from its usual seasonal Overhead costs during the period of delay <br /> (12.4.C.5.b.1)d)), the Contractor must; <br /> ii) Affirmatively represent and warrant that the completion of the subject <br /> Work was extended and that such extension prevented the performance <br /> of other work during both the period of delay and the later period of time <br /> required to complete the extended Work, <br /> iii)Disclose the details of Contractor generated billings and Contractor <br /> Overhead Costs (as hereinafter defined) throughout the actual project <br /> performance. The details of such information should be no less than <br /> specific identification of the sources and amounts of revenue on no <br /> greater than a monthly basis and specific identification of the types and <br /> amounts of Contractor Overhead Costs on no greater than a monthly <br /> basis for the actual Project duration. <br /> c. Overabsorbed Overhead <br /> 1) To demonstrate that it did not incur Overabsorbed Overhead in the period <br /> following the Delay(12.4.C.5.b.1)e)),the Contractor must: <br /> a) Affirmatively represent and warrant that completion of the delayed Work <br /> prevented the performance of other work; <br /> b) Identify the critical resource unavailable for other work due to completion of <br /> the delayed Contract; and <br /> c) Showing that unavailability of this critical resource precluded the <br /> performance of other work. <br /> WFP Operations Building Seismic Retrofit-Rebid January 6, 2017 <br /> WO#UP3600 007213 - 59 <br />