Laserfiche WebLink
D. Electrical permits can be obtained at: <br /> City of Everett <br /> 3200 Cedar Street—2'd Floor <br /> Everett,WA 98201 <br /> Phone: 425/257-8800 <br /> 16.3 Patents and Royalties <br /> A. Payment for Patents and Royalties. <br /> 1. Contractor shall pay for all costs involved in fees, royalties, or claims for any patented <br /> invention, article, process or method that may be used upon or in a manner connected with <br /> the Work under this Contract or with use of completed Work by the Owner. <br /> 2. The Contractor and its sureties shall protect and hold the Owner, Owner's Representative, <br /> and Owner's Representative,together with its officers, agents, and employees, harmless from <br /> any and all loss, defense cost, and expenses and against any and all demands made for such <br /> fees or claims brought or made by the holder of any invention or patent. <br /> 3. Before final payment is made on the account of this Contract, the Contractor shall, if <br /> requested by the Owner, furnish acceptable proof of a proper release from all such fees or <br /> claims. <br /> B. Should the Contractor, its agent, employee or any of them be enjoined from furnishing or using <br /> any invention, article, material or plans supplied or required to be supplied or used under this <br /> Contract, Contractor shall promptly pay such royalties and secure requisite licenses; or, subject to <br /> acceptance by Owner, substitute other articles, materials, or appliances in lieu thereof that are of <br /> equal efficiency, quality, finish, suitability and market value to those planned or required under <br /> the Contract. Descriptive information of these substitutions shall be submitted to the Owner's <br /> Representative for determination of general conformance to the design concept and the <br /> construction Contract. Should Owner elect to refuse the substitution, Contractor agrees to pay <br /> such royalties and secure such valid licenses as may be requisite for the Owner, its officers, <br /> agents and employees or any of them, to use such invention, article, material or appliance without <br /> being disturbed or in any way interfered with by any proceeding in law or equity on account <br /> thereof. <br /> ARTICLE 17 AUDITS <br /> 17.1 General <br /> A. Record Retention. <br /> 1. The Contractor's records relating to this Project, including, but not limited to, wage,payroll, <br /> and cost records, shall be open to inspection or audit by representatives of the Owner during <br /> the Project and for a period of not less than six years after the date of Final Acceptance of <br /> the Contract. <br /> a. The Contractor shall retain these records for that period. <br /> b. The Contractor shall also guarantee that Project records of Subcontractors, Suppliers, <br /> and lower tier Subcontractors, including, but not limited to, the wage, payroll, and cost <br /> records, shall be retained and open to similar inspection or audit for the same period of <br /> time. <br /> B. Audit Performance <br /> WFP Operations Building Seismic Retrofit- Rebid January 6, 2017 <br /> WO#UP3600 007213 -68 <br />