My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kassel & Associates 3/28/2017
>
Contracts
>
Capital Contract
>
Kassel & Associates 3/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:33:03 AM
Creation date
4/11/2017 3:25:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kassel & Associates
Approval Date
3/28/2017
Council Approval Date
2/15/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Kassel & Associates
Public Works WO Number
UP3600
Tracking Number
0000567
Total Compensation
$756,942.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kassel & Associates 3/21/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 7/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 9/29/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS <br /> SPECIAL PROVISIONS <br /> SUBSTITUTION REQUEST FORM <br /> SPECIFIED ITEM: <br /> Section Paragraph Specified Item <br /> PROPOSED SUBSTITUTION: <br /> I hereby certify: <br /> A. I have personally investigated proposed product and, in my opinion, it is equal or superior in all <br /> respects to that specified. <br /> B. I will coordinate installation of accepted substitution and guarantee to complete it in all respects. <br /> C. The product carries same warranty as specified product. <br /> D. I will pay for changes to the design, including engineering and detailing costs caused by the <br /> requested substitution. <br /> E. I will pay additional costs related to substitution that become apparent as a consequence of this <br /> substitution. <br /> F. The proposed substitution has no adverse affect on other trades, other contracts, construction <br /> schedule. <br /> G. Maintenance and service parts will be locally available for the proposed substitution. <br /> H. My cost impact figures are complete and include related costs under the Contract, but exclude <br /> costs under separate contracts, if applicable. <br /> I. I waive claims for additional costs related to the substitution that subsequently become apparent. <br /> Attached are submittals supporting this request; and cost savings offered, if applicable. <br /> SIGNATURE TITLE <br /> CONTRACTOR DATE <br /> ADDRESS TELEPHONE <br /> FOR USE BY OWNER'S REPRESENTATIVE: <br /> ACCEPTED ACCEPTED AS NOTED NOT ACCEPTED <br /> REMARKS: <br /> END OF SUBSTITUTION REQUEST FORM <br /> WFP Operations Building Seismic Retrofit-Rebid January 6, 2017 <br /> WO#UP3600 012513 -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.