Laserfiche WebLink
CITY OF EVERETT PUBLIC WORKS <br /> SPECIAL PROVISIONS <br /> G. Testing Agency: An entity engaged to perform specific tests, inspections, or both. Testing <br /> laboratory shall mean the same as testing agency. <br /> H. Installer/Applicator/Erector: The Contractor or another entity engaged by the Contractor as an <br /> employee, Subcontractor, or Sub-subcontractor, to perform a particular construction operation, <br /> including installation, erection, application, and similar operations. <br /> 1. Use of trade-specific terminology in referring to a trade or entity does not require that <br /> certain construction activities be performed by accredited or unionized individuals, or <br /> that requirements specified apply exclusively to specific trade(s). <br /> I. Experienced: When used with an entity or individual, "experienced" means having successfully <br /> completed a minimum of five previous projects similar in nature, size, and extent to this <br /> Project; being familiar with special requirements indicated; and having complied with <br /> requirements of authorities having jurisdiction. <br /> 1.3 CONFLICTING REQUIREMENTS <br /> A. Referenced Standards: If compliance with two or more standards is specified and the standards <br /> establish different or conflicting requirements for minimum quantities or quality levels, comply <br /> with the most stringent requirement. Refer conflicting requirements that are different, but <br /> apparently equal,to the Engineer for a decision before proceeding. <br /> B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be <br /> the minimum provided or performed. The actual installation may comply exactly with the <br /> minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. <br /> To comply with these requirements, indicated numeric values are minimum or maximum, as <br /> appropriate, for the context of requirements. Refer uncertainties to the Engineer for a decision <br /> before proceeding. <br /> 1.4 INFORMATIONAL SUBMITTALS <br /> A. Contractor's Statement of Responsibility: When required by authorities having jurisdiction, <br /> submit copy of written statement of responsibility sent to authorities having jurisdiction before <br /> starting work on the following systems: <br /> 1. Seismic-force-resisting system, designated seismic system, or component listed in the <br /> designated seismic system quality-assurance plan prepared by the Engineer. <br /> B. Testing Agency Qualifications: For testing agencies specified in "Quality Assurance" Article to <br /> demonstrate their capabilities and experience. Include proof of qualifications in the form of a <br /> recent report on the inspection of the testing agency by a recognized authority. <br /> 1.5 REPORTS AND DOCUMENTS <br /> A. Test and Inspection Reports: Prepare and submit certified written reports specified in other <br /> Sections. Include the following: <br /> WFP Operations Building Seismic Retrofit-Rebid January 6, 2017 <br /> WO#UP3600 014000-2 <br />