Laserfiche WebLink
CITY OF EVERETT PUBLIC WORKS <br /> SPECIAL PROVISIONS <br /> E. Professional Engineer Qualifications: A professional engineer who is legally qualified to <br /> practice in jurisdiction where Project is located and who is experienced in providing <br /> engineering services of the kind indicated. Engineering services are defined as those performed <br /> for installations of the system, assembly, or product that are similar in material, design, and <br /> extent to those indicated for this Project. <br /> F. Specialists: Certain Specification Sections require that specific construction activities shall be <br /> performed by entities who are recognized experts in those operations. Specialists shall satisfy <br /> qualification requirements indicated and shall be engaged for the activities indicated. <br /> 1. Requirements of authorities having jurisdiction shall supersede requirements for <br /> specialists. <br /> G. Testing Agency Qualifications: An NRTL, an NVLAP, or an independent agency with the <br /> experience and capability to conduct testing and inspecting indicated, as documented according <br /> to ASTM E329; and with additional qualifications specified in individual Sections; and, where <br /> required by authorities having jurisdiction,that is acceptable to authorities. <br /> 1. NRTL: A nationally recognized testing laboratory according to 29 CFR 1910.7. <br /> 2. NVLAP: A testing agency accredited according to NIST's National Voluntary Laboratory <br /> Accreditation Program. <br /> H. Manufacturer's Representative Qualifications: An authorized representative of manufacturer <br /> who is trained and approved by manufacturer to observe and inspect installation of <br /> manufacturer's products that are similar in material, design, and extent to those indicated for <br /> this Project. <br /> Preconstruction Testing: Where testing agency is indicated to perform preconstruction testing <br /> for compliance with specified requirements for performance and test methods, comply with the <br /> following: <br /> 1. The Contractor responsibilities include the following: <br /> a. Provide test specimens representative of proposed products and construction. <br /> b. Submit specimens in a timely manner with sufficient time for testing and analyzing <br /> results to prevent delaying the Work. <br /> c. Build laboratory mockups at testing facility using personnel,products, and methods <br /> of construction indicated for the completed Work. <br /> d. When testing is complete, remove test specimens, assemblies, and mockups; do not <br /> reuse products on Project. <br /> 2. Testing Agency Responsibilities: Submit a certified written report of each test, <br /> inspection, and similar quality-assurance service to the Engineer through the Owner's <br /> Representative, with copy to the Contractor. Interpret tests and inspections and state in <br /> each report whether tested and inspected work complies with or deviates from the <br /> Contract Documents. <br /> 1.7 QUALITY CONTROL <br /> A. Owner Responsibilities: Where quality-control services are indicated as the Owner's <br /> responsibility,the Owner will engage a qualified testing agency to perform these services. <br /> WFP Operations Building Seismic Retrofit-Rebid January 6,2017 <br /> WO#UP3600 014000-4 <br />