My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kassel & Associates 3/28/2017
>
Contracts
>
Capital Contract
>
Kassel & Associates 3/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:33:03 AM
Creation date
4/11/2017 3:25:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kassel & Associates
Approval Date
3/28/2017
Council Approval Date
2/15/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Kassel & Associates
Public Works WO Number
UP3600
Tracking Number
0000567
Total Compensation
$756,942.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kassel & Associates 3/21/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 7/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 9/29/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS <br /> SPECIAL PROVISIONS <br /> check, which shall be not less than five percent of the Total Bid Amount bid, may be <br /> shown in dollars or on a percentage basis. <br /> 5. Disadvantaged/Women's Business Enterprise: To be filled in and signed by the <br /> Bidder. <br /> 6. Non-Collusion Affidavit: To be signed, notarized and submitted with the Bid. <br /> B. Failure to complete and fully execute the aforementioned forms and to submit them with the <br /> Bid may result in rejection of Bid. <br /> C. The following forms are to be executed after the award of Contract: <br /> 1. Contract: This Contract to be executed by the successful Bidder in duplicate within 14 <br /> calendar days after the award date. <br /> 2. Payment and Performance Bond: Both forms are to be executed by the successful <br /> Bidder and his surety company in duplicate. The amount of each bond shall be 100 <br /> percent of the Total Bid Amount and shall be submitted with the Contract. <br /> 3. Proof of Insurance: Insurance certificates and endorsements shall be obtained and <br /> maintained in force in accordance with Document 007213, Part 15 "Liability and <br /> Insurance", of the Contract Documents. <br /> 4. Power of Attorney: Attorneys-in-fact who sign bid bonds or contract bonds must file <br /> with each bond a certified and effectively dated copy of their Power of Attorney. <br /> 5. Statement of Intent to Pay Prevailing Wage(L&I Form F700-029-000) and Affidavit <br /> of Wages Paid (F700-007-000) from the Contractor, Subcontractor and agents to the <br /> Subcontractor shall be submitted to the Employment Standards Division, State <br /> Department of Labor and Industries, Olympia, Washington. If the prime contract is over <br /> $1,000,000, then Contractor also needs to submit L&I Form F700-164-000 (Affidavit of <br /> Wages Paid EHB 2805 Addendum). <br /> 6. Weekly Statement with Respect to Payment of Wages (U.S. Dept of Labor Form <br /> WH347): Contractors, Subcontractors, and agents to Subcontractors using Payroll Form <br /> WH347)may use State of Compliance found on back of form. <br /> 7. Weekly Statement of Compliance (U.S. Dept of Labor Form WH 348). Contractors, <br /> Subcontractors, or agents to Subcontractors not using Payroll Form WH347 shall attach <br /> the Statement of Compliance Form WH 348 to each payroll. <br /> 8. Approval of Subcontractors: Contractors shall request approval of Subcontractors on a <br /> form provided by the City prior to their working on the Site. <br /> 9. Construction Progress Schedule: To be submitted as required by Document 007213, <br /> Part 5 "Progress and Completion", of the Contract Documents by the Contractor within <br /> ten calendar days, or such time as determined by the City, after the date of receipt of <br /> Notice to Proceed. <br /> 10. Traffic Control Plan: Standard Traffic Control Plans are included in the City's Design <br /> and Construction Standards. If, and to the extent, such plans are not sufficient, complete <br /> or adequate to support the Bidder's planned means and methods of performing the Work, <br /> the Bidder must develop an adequate, complete and sufficient traffic control plan at its <br /> cost,that shall be submitted for the City's approval prior to construction. Deviation from <br /> WFP Operations Building Seismic Retrofit-Rebid January 6, 2017 <br /> WO#UP3600 002113 - 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.