My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kassel & Associates 3/28/2017
>
Contracts
>
Capital Contract
>
Kassel & Associates 3/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:33:03 AM
Creation date
4/11/2017 3:25:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kassel & Associates
Approval Date
3/28/2017
Council Approval Date
2/15/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Kassel & Associates
Public Works WO Number
UP3600
Tracking Number
0000567
Total Compensation
$756,942.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kassel & Associates 3/21/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 7/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 9/29/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OW , - <br /> ,r„3/4„,/-A <br /> PUBLIC WORKS <br /> J <br /> ADDENDUM NO. 1 <br /> TO <br /> WFP OPERATIONS BUILDING SEISMIC RETROFIT - REBID <br /> W.O. # UP-3600 <br /> JANUARY 25, 2017 <br /> NOTICE TO PLANHOLDERS: <br /> Addendum No. 1 contains the following revisions, additions, deletions and clarifications and is <br /> hereby made a part of the contract documents for the above named Project and shall be <br /> considered by all prospective bidders in submitting bids. <br /> Bidders must acknowledge receipt of Addendum No. 1 in the space provided on page 004113- 2 <br /> and 3 in Document 004113 — Bid Form. Failure to comply with this requirement may render the <br /> Bid non-responsive and may cause its rejection. <br /> This Addendum consists of 3 pages, including all revisions, attachments and details. <br /> The Bid date, time and location for receipt of Bids are unchanged by this Addendum. <br /> SPECIFICATIONS, PROPOSAL AND CONTRACT DOCUMENTS <br /> Item 1 - SPECIFICATIONS — SECTION 011100 — SUMMARY OF WORK <br /> Supplement 1.3.A.1. by adding the following: <br /> g. Electrical vault work between the Auxiliary Generator and the Main Operations <br /> Building has been removed from the Contract. <br /> h. Ceiling tile panels removed to facilitate seismic retrofit work do not need to be <br /> replaced. <br /> Item 2 - SPECIFICATIONS — DOCUMENT 024119 — SELECTIVE DEMOLITION <br /> Revise 1.2.B to read as follows: <br /> Remove acoustic ceiling tile, T-bar grid, wall support angles, and lights. Provide <br /> temporary lighting as needed to conduct work. Where lighting is supported independent <br /> of the ceiling grid by at least two wires at opposite corners, such lighting may be <br /> temporarily left in place to provide lighting during construction and removed near the <br /> end of the work. <br /> Delete part 3.3.B.1. <br /> Addendum 1 Page 1 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.