My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kassel & Associates 3/28/2017
>
Contracts
>
Capital Contract
>
Kassel & Associates 3/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:33:03 AM
Creation date
4/11/2017 3:25:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kassel & Associates
Approval Date
3/28/2017
Council Approval Date
2/15/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Kassel & Associates
Public Works WO Number
UP3600
Tracking Number
0000567
Total Compensation
$756,942.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Kassel & Associates 3/21/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 7/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Kassel & Associates 9/29/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS <br /> SPECIAL-:PROVISIONS <br /> ITEM NO. DESCRIPTION UNIT CONTRACT PRICE <br /> 1. BASE BID LS $ Cm9 7 oc>. (>v <br /> v <br /> 2. Washington State Sales Tax C 8.6% $ 00 <br /> 3. TOTAL BID $ -75.‘ 620 <br /> 1.3 AC(EPTANCF <br /> A. This offer shall be open to acceptance and is irrevocable for 45 days from the Bid closing date. <br /> B. If this Bid is accepted by the Owner within the time period stated above,we will: <br /> 1. Execute the Agreement within 14 days of receipt of Notice of Award. <br /> 2 Furnish the required 100%payment.and 100% performancebonds within 14 calendar <br /> days of receipt of Notice of Award in the form described in Supplementary Conditions. <br /> S. Commence Work within seven calendar days after receipt of Notice to Proceed. <br /> C. If this Bid is accepted within the indicated time,and we fail to commence the Work or we fail to <br /> provide the required bonds, the Bid security shall be forfeited as damages to the Owner by <br /> reason of our failure, linuted in amount to the lesser of the face value of the Bid security or the <br /> difference:between this Bid and the Bid upon which Contract is signed. <br /> D. In the event our Bid is not accepted within the time stated above,the required Bid security will <br /> be returned to the undersigned,:according tothe provisions of the Instructions to Bidders,unless <br /> a mutually.satisfactory arrangement is made for its retention and validity for an extended,period <br /> of time. <br /> 1.4 CONTRACT TIME <br /> A. If this Bidis accepted,we will: <br /> 1. Begin work iminediately after receiving Owner's letter.of Notice to Proceed and to reach <br /> Substantial Completion Within the dates required under the Contract Documents. <br /> 2. Agree to pay liquidated damagesto the City as stated in the Contract(Document 006013) <br /> in the event the project is not completed on or before required time periods. <br /> S. Contract with the Owner using the Contract form provided herewith, onthe terms and <br /> conditions contained herein,to do everything necessary for to complete the construction <br /> of the projectWithin the allotted time. <br /> 1.5 ADDENDA <br /> A. Following Addenda have been received, and the modifications to the Bid Documents noted <br /> below have been considered and all costs are included in the Bid Sum. <br /> 1. Addendum No. ,dated,. .fUla(Y 25, 2017 <br /> WFP Operations Building Seismic Retrofit-'Rebid January 6,2917 <br /> WO#UP3600 004113 -2 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.