My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/12/02 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/12/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2017 8:33:25 AM
Creation date
4/12/2017 8:32:43 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/2/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> Exhibit A-1 <br /> Scope of Work <br /> Project No. Surveying Services <br /> 1 The Contractor agrees to furnish the services of a licensed professional land surveyor(PIS)and appropriate <br /> technical support/survey field personnel to provide on-call survey services for the City as defined by the Task <br /> Assignment Scope of Services <br /> 7. The survey crew shall work on an"as requested"basis only,as determined by the City's Project Manager or <br /> Constriction Engineer If the Contractor is not in a position to provide the survey crew at the time requested by <br /> the City,then the Contractor may decline the request without prejudice <br /> '1 Prior to mutual acceptance of a task assignment,the Contractor will prepare a written itemi7.ed cost estimate <br /> for the requested services <br /> 4 The survey crew shall be supervised by a licensed PLS,and shall coordinate with the Project Manag•.r or <br /> Constniction Eng'neer,as required,to ensure all required surveying,in the Task Assignment,is performed as <br /> requested by the City <br /> 5 The survey party chief shall he responsible to keep all notes in a city-furnished survey honk and shall record a <br /> day-to-day report of all survey activities Said survey book shall be returned to the City Project Manager or <br /> Construction Fng'neer at the completion of the work Survey field notes shall conform to the requirements of the <br /> most recent edition of the"Survey and CAD Standards for the City of Everett" <br /> 6 All survey drawings,cross sections and profiles shall he prepared in AlitoCAT) in accordance with the most <br /> recent edition of the"Surveying and CAD Standards for the City of Everett" <br /> 7 The Surveyor shall schedule and meet with the City CAD Manager prior to heg'nning any survey work,to <br /> establish control,required standards,electronic exchange standards(Exhibit C) and to pick up a field honk This <br /> meeting is required for each task asci•nment <br /> Documents To Be Furnished By The Consultant <br /> 1 Completed (city-furnished)field honk <br /> 7 Survey deliverables will typically include- <br /> a Orig'nal drawings on 27"X'14"reproducible media (mylar) <br /> h Electronic drawing files in Civil '1D, or AutoCAD"dwg"format <br /> c Point files including point#,northing, easting,elevation and description <br /> d Land XMT,files <br /> e Any digitalterrain model file(eg• DTM,DEM,etc)g-nerated from the assigned work <br /> DOT Form 140-089 EF Exhibit A-1 2 2 <br /> Revised 6/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.