My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/12/16 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/12/16 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2017 9:15:00 AM
Creation date
4/12/2017 9:14:14 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/16/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 3 CITY OF EVERETT <br /> FINAL CONTRACT VOUCHER CERTIFICATION <br /> CONTRACTOR:Tri State Construction ADDRESS: PO Box 3686 <br /> CITY:Bellevue STATE: WA 98009 DATE: October 15,2009 <br /> PROJECT HALE: BNSF Delta Yard Sewer Protection WORK ORDER NO. 3372 <br /> DATE WORK COMPLETE: September 22,2009 FINAL AMOUNT: $ 962,541.15 <br /> CONTRACTOR'S CERTIFICATION <br /> I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work performed <br /> and material furnished to the City of Everett, that the same .or any part thereof has not been paid, and that I am <br /> authorized to sign for the claimant; that I have not rented or purchased any equipment or materials from any <br /> employee of the City; I further certify that the attached final estimate is a true and correct statement showing all the <br /> monies due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br /> understand the same and that I hereby release the City of Everett from any and all claims of whatsoever, nature <br /> which I may have,arising out of the performance of said contract,which are not set forth in said estimate. <br /> • <br /> X Prvl QX l,S C.�Pn CONTRACTOTITLE 6 Mq � <br /> ,��.� <br /> Tri State Construction �.` �S •Viii• *' 'e <br /> Subscribed and sworn to before : I NOTARY <br /> me this `' `day f ,� 1�X (2.01)°I o • <br /> X .I -aottary Public sly; <br /> �9`�.ys oe�so� ,.•'rf <br /> in and for the State of Washington,residing at 1)ua,I, p <br /> j�WAN <br /> • 01°�` <br /> PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> • <br /> y <br /> I Certify the attached final APPROVED Date: <br /> • <br /> estimate to be based upon actual <br /> measurements and to be true and correct. <br /> X01.nstruction Maner Public Wor. ,.' i2li4k <br /> rector <br /> Tom Fuchs Dave Davis <br /> INSTRUCTIONS <br /> The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br /> agents and forwarded with the Final Contract Voucher Certification. <br /> Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br /> attached. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.