My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009/12/23 Council Agenda Packet
>
Council Agenda Packets
>
2009
>
2009/12/23 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2017 9:25:10 AM
Creation date
4/12/2017 9:24:42 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/23/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-.. <br /> t 'Y� �i''�r{ .7 ♦c.., i .4 -r , <br /> s 3 e <br /> # �OtO IVIB �WNTD- S FILLMI Y; 'Lan.' iG 0411 i a r. `? L ra r a <br /> .fit ��p s" —-r 3 <br /> k ,i:�+' r� syY6'}SI -n `��hl u.'^..i�, hy5 t.``F4 Fy � 3�("i' c5..:'�,�. 3 .Fs e } if 1;'ir,�. }�-� "�� .e.` .�.Fr <br /> PROJECT TITLE: 6" <br /> Award of construction contract Consent ' COUNCIL BILL# <br /> for the Carl Gipson Senior X Action Originating Department Facilities <br /> Center of Everett- Additions First Reading Contact Person Ruben Sanchez <br /> Project to Corstone Second Reading Phone Number 257-8896 <br /> Contractors, LLC Third Reading FOR AGENDA OF Dec. 23,2009 <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA �db,�� f <br /> Council President G <br /> Location Preceding Action Attachments Department(s) Approval <br /> 3025 Lombard Ave. 11/24/09 Call for Bids Bid Results Facilities/Fire Department <br /> Amount Budgeted $983,000.00 <br /> Expenditure Required $844,427.22 Account Number(s): <br /> Budget Remaining $138,572.78 342-513-0000-650 <br /> Additional Required 0.00 <br /> DETAILED SUMMARY STATEMENT: <br /> On November 24, 2009, sealed bids were opened for the Carl Gipson Senior Center of Everett-Additions <br /> Project. The purpose of this project will be to expand the dining room portion of the building towards the <br /> East,to allow for more dining space and a new kitchen, an addition of approximately 2,100 square feet. The <br /> stage (platform) will be expanded, new wood flooring will be installed in the existing dining space, and a <br /> new elevator and storage room will be added. <br /> The Facilities Department has determined Corstone Contractors, LLC to be the lowest responsive bidder <br /> (See attached bid results). A breakdown of construction costs are as follows: <br /> Base Bid: $773,285.00 <br /> Sales Tax: $ 71,142.22 <br /> Total: $844,427.22 <br /> RECOMMENDATION: <br /> Award construction contract for the Carl Gipson Senior Center of Everett- Additions Project to Corstone <br /> Contractors,LLC of Snohomish in the amount of$844,427.22 including Washington State sales tax. <br /> 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.