BID TABULATION
<br /> BOND STREET CSO FACILITIES-BOND STREET INTERCEPTOR
<br /> w.O.#UP 507
<br /> Date 12/9/2009
<br /> Jrepared By:William Barrett
<br /> For:Heather Griffin,Project Engineer ENGINEER'S ESTIMATE Shoreline Construction G.G.Excavation KLB Construction Thomco Construction
<br /> ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL
<br /> 6 ITEM DESCRIPTION UNIT QUANTI3j PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT_ PRICE AMOUNT PRICE AMOUNT
<br /> 19 Combined Sewer Pipe,(MH1 to LF 765 $300.00 $229,500.00 $220.00 $168,300.00 $187.27 $143,261.55 $185.00 $141,525.00 $190.10 $145,426.50
<br /> MH5),36-Inch PS-115 PVC
<br /> 20 Temporary Sedimentation& LS 1 $12,000.00 $l2,000.00 $1,000.00 $1,000.00 $2,400.11 $2,400.11 $1,500.00 $1,500.00 $5,800.00 $5,800.00
<br /> Erosion Control
<br /> 21 Concrete Sidewalk SY 50 $200.00 $10,000.00 $50.00 $2,500.00 $44.13 $2,206.50 $39.00 $1,950.00 $40.31 $2,015,50
<br /> 22. Concrete Curb LF 100 $100.00 $10,000.00 $30.00 $3,000.00 $31.08 $3,108.00 $28.00 $2,800.00 $27.58 $2,758.00
<br /> 23 Curb Ramp,Type D EA 1 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $1,131.47 $1,131,47 $1,500.00 $1,500.00 $955.00 $955.00
<br /> 24 Crushed Surfacing Top Course Ton 650 $35.00 $22,750.00 $22.00 $14,300.00 $16.52 $10,738.00 $21.00 $13,650.00 $18.00 $11,700.00
<br /> 125 Crushed Surfacing Base Course Ton 1500 $32.00 $48,000.00 $0.10 $150.00 $15.63 $23,445.00 $20.00 $30,000.00 $18.00 $27,000.00
<br /> 26 Gravel Borrow Ton 3400 $35.00 $119,000.00 $0.10 $340.00 $8.85 $30,090.00 $13.00 $44,200.00 $11.62 $39,508.00
<br /> 27 Foundation Material Class A Ton 100 $50.00 $5,000,00 $0.10 $10.00 $20.07 $2,007.00 $20.00 $2,000.00 $34.68 $3,468.00
<br /> 28 Force Account Work FA 1 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00
<br /> J
<br /> W
<br /> Subtota1s, $1,261,383.00 $586,480.00 $616,746.16 $644,770.00 $675,742.30
<br /> WA Sales Tax:9.2% $116,047.24 $53,956.16 $56,740.65 $59,318.84 $62,16829
<br /> Contract Totals: $1,377,430.24 $640,436.16 $673,486.81 $704,088.84 $737,910.59