|
BID TABULATION
<br /> BOND STREET CSO FACILITIES-BOND STREET INTERCEPTOR
<br /> W.O,#UP O7
<br /> Date 12/9/2009
<br /> prepared By:William Barrett
<br /> For:Heather Griffin,Project Engineer ENGINEER'S ESTIMATE Mosbrucker Excavating,Inc Construct Company,LLC BDZ Developers,Inc. Universal Land Const.Co
<br /> •ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL
<br /> . # ITEM DESCRIPTION UNIT 4UANTITYL PRICE AMOUNT_ PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
<br /> 19 Combined Sewer Pipe,(MH Ito LF 765 - $300.00 $229,500.00 5200.00 $153,000.00 $335.00 $256,275.00 $290.00 5221,850.00 5284.00 5217,260,00
<br /> MH5),36-Inch PS-115 PVC
<br /> 20 Temporary Sedimentation& LS 1 $12,000.00 $12,000.00 $2,000.00 $2,000.00 $500,00 $500.00 $4,000.00 $4,000.00 $1,500.00 $1,500.00
<br /> Erosion Control
<br /> 21 Concrete Sidewalk SY 50 $200.00 $10,000.00 $50.00 $2,500.00 $47.00 $2,350.00 $36.00 51,800.00 $49.00 $2,450.00
<br /> 22 Concrete Curb LF 100 $100.00 $10,000.00 $30.00 $3,000.00 $31.00 $3,100.00 $24.00 $2,400.00 $32.00 $3,200.00
<br /> 23 Curb Ramp,Type D EA 1 $2,000.00 $2,000.00 $1,500.00 $1,500.00 $1,150.00 $1,150.00 $1,000.00 $1,000.00 $1,000.00 51,000.00
<br /> 24 Crushed Surfacing Top Course Ton 650 $35.00 $22,750.00 $25.00 $16,250.00 520.00 513,000.00 $15.00 $9,750.00 513.00 $8,450.00
<br /> 25 Crushed Surfacing Base Course Ton 1500 $32.00 $48,000.00 525.00 $37,500.00 $13.00 $19,500.00 515.00 $22,500.00 $13.00 ' $19,500.00
<br /> •
<br /> 26 Gravel Borrow Ton 3400 $35.00 $119,000.00 $20.00 $68,000.00 $1.00 $3,400.00 $0.01 $34.00 $12.00 $40,800.00
<br /> 27 Foundation Material Class A Ton 100 $50.00 $5,000.00 $50.00 $5,000.00 520.00 $2,000.00 $30.00 $3,000.00 $30.00 $3,000.00
<br /> 28 Force Account Work FA 1 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 5140,000.00 $140,000.00 $140,000.00
<br /> lD _
<br /> Subtotals: $1,261,383.00 $752,670.00 $767,235.00 5768,024.00 $772,060.00
<br /> WA Sales Tax:9.2% $116,047.24 569,245.64 $70,585.62 $70,658.21 $71,029.52
<br /> Contract Totals: $1,377,430.24 $821,915.64 $837,820.62 $838,682.21 $843,089.52
<br /> 1
<br /> •
<br /> C-C)
<br />
|