Laserfiche WebLink
CERTIFICATE OF COMPLETION <br /> Project: 2009 Hot Mix Asphalt Overlay <br /> Contractor: Cemex Construction Materials <br /> Work Order No. PW3346 <br /> The above mentioned project was constructed per the plans and specifications and to the <br /> satisfaction of the Public Works Department. <br /> The Contractor physically completed the project, within the time allowed in the contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> / , 1 � (27-090'0) <br /> Engineeri 1F6 i i wtor Date <br /> Dave Davis <br /> Approved by: <br /> Mayor, City of Everett Date <br /> Ray Stephanson <br /> Attest: <br /> City Clerk <br /> Sharon Marks <br /> APPROVED AS TO FORM <br /> Jim Iles, City Attorney <br /> 10 <br />