My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11219 19TH AVE SE WHOLE SITE DEVELOPMENT 2018-08-13
>
Address Records
>
19TH AVE SE
>
11219
>
WHOLE SITE DEVELOPMENT
>
11219 19TH AVE SE WHOLE SITE DEVELOPMENT 2018-08-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2018 11:31:37 AM
Creation date
4/12/2017 9:50:21 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
11219
Tenant Name
WHOLE SITE DEVELOPMENT
Notes
SILVERLAKE CENTER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
671
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P, ���a +'a-a cxa..+l � N� �,69 ����F�tl 6�� � �� � �������� ���8 .. <br /> �����FzS; �eotechnical Engineering,Construc�ion Inspection&Materials Testing � <br /> � : -�` "_; 6747 M. L. I<ing Way South,Seattle,Washington 9811Fi-3216 USA ; <br /> _' ;':" :_'__'`�: Tel: (206)725-4600 a Toll Free: (SaII)OTTO-4-US a Fax:(206)723-2221 <br /> - ----- - -- -- -- W�E W2P5913684 o WA�O Regisfered Agency� Websile:www.ottorosenau.com <br /> June 4,7_015 <br /> �� 0��4'.� ������ 'J <br /> City of Everett Plai�nir�i��Commurii�y I�evr�loprYieni I � <br /> � <br /> "L930 Wetrnorc�venue,Suile�3� , <br /> cvFr��ti,wn���2o_i. <br /> Project: Silvei�I_al<e al<a l-he Towns at Silvei�I_ake OR/1 Job Number: 15-005?_ <br /> �INAL REPORT FOR: Building 3—Permits C1.�11-01.3;C:1.47.'1_-0:1.4; C1411-0�.5;C1411-016;C1411-017 ; <br /> We state that the wori< requiring special inspection was, to the t�est of our Icnowledge, in conformance with the <br /> approved plans and specifications and the applicable workmanship provision of the building code. Our knowledge ', <br /> is limited to our reports, <br /> All typewritten reports have been mailed to your office or are enclosed. All reports appear to be complete. This i <br /> report should not be considered as a warranty for conditions and/or details of the building. <br /> Items inspected are: <br /> 1. Reinforced concrete—footings,foundation walls and slabs <br /> k' <br /> �Sincerely, -_,,,� <br /> OTTO ROSEN�U&AS50CIATES, INC. "' <br /> �,�c�an 2��'�00�-. <br /> Susan Rosenau-Moser <br /> Vice President i <br /> � <br /> Email c: Project Team � <br /> I <br /> � <br /> I <br /> � <br /> � <br /> i <br /> I <br /> � <br /> i <br /> �:;_ <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.