Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: 4 <br /> Call for construction bids for X Consent COUNCIL BILL# <br /> the Replacement of Water Action Originating Department Public Works <br /> Transmission Line#2—Phase First Reading Contact Person Souheil Nasr <br /> 8B Project Second Reading Phone Number (425) 257-7210 <br /> Third Reading FOR AGENDA OF Jan. 20, 2010 <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> South of 20th St. SE, Authorization to Sign Public Works <br /> between S Lake Stevens Professional Services <br /> Road& 119t Ave. SE east Agreement with HDR,Inc. <br /> of Everett. to Prepare Engineering <br /> Design and Permitting <br /> Services for Replacement <br /> of Water Transmission <br /> Line#2—Phase 8B. <br /> Amount Budgeted $7,000,000 <br /> Expenditure Required $2,000 Account Number(s): <br /> Budget Remaining $6,998,000 UP 3333-3 <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> The Replacement for Water Transmission Line#2 (Phase 8B Project) is ready to advertise for construction <br /> bids. This project will replace approximately 5,100 feet of the existing 48 inch diameter Water Transmission <br /> Line#2 between S Lake Stevens Road and 119th Avenue SE. <br /> RECOMMENDATION: <br /> Authorize a call for construction bids for the Replacement of Water Transmission Line#2—Phase 8B Project. <br /> 7 <br />