Laserfiche WebLink
• CITY OF EVERETT 5 <br /> FINAL CONTRACT VOUCHER CERTIFICATION <br /> CONTRACTOR: Travers Electric ADDRESS: 122 Sturdevant Road <br /> CITY: Chehalis STATE: WA 98532 DATE: December 18,2009 <br /> PROJECT TITLE: Signal Improvements: Broadway&Everett AveWORK ORDER NO. 3244 <br /> DATE WORK COMPLETE: September 2,2009 FINAL AMOUNT: $665,631.42 <br /> CONTRACTOR'S CERTIFICATION <br /> I,the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work performed <br /> and material furnished to the City of Everett, that the same or any part thereof has not been paid, and that I am <br /> authorized to sign for the claimant; that I have not rented or purchased any equipment or materials from any <br /> employee of the City; I further certify that the attached final estimate is a true and correct statement showing all the <br /> monies due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br /> understand the same and that I hereby release the City of Everett from any and all claims of whatsoever nature <br /> which I may ave, arising out of the performance of said contract, which are not set forth in said estimate. <br /> X e 1 X Pre..,,S 1(L€ <br /> CONT CTOR TITLE I Notary Public <br /> TST,Inc. dba Travers Electric , • State of Washington <br /> MARGE A MOEN <br /> Subscribed and sworn to before I My Appointment'Expires Oct 26,zoto <br /> m t is H4-`--da. • - ab t o <br /> �Q�n ' Notary Public <br /> in and`fort►�- t.te . Washington, residing at 0i PS '7 <br /> � <br /> PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> I Certify the attached final APPROVED Date: <br /> estimate to be based upon actual <br /> measurements and to be true and correct. <br /> X X III/4 (((f(iD <br /> Construction Manager Public Works : rector <br /> Tom Fuchs Dave Davis <br /> INSTRUCTIONS <br /> The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br /> agents and forwarded with the Final Contract Voucher Certification. <br /> Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br /> attached. <br /> Revised 9/94 <br /> 11 <br />