Laserfiche WebLink
CITY OF EVERETT <br /> 1995-2000 SIX-YEAR TRANSPORTATION IMPROVEMENT PLAN SUMMARY <br /> PROJI:CI PHUJtCI PE H/W CONS/. '90.2001) Lead Map <br /> TYPE PRIORITY NAME TERMINI START START START COST Agency No. <br /> nterstates and Freeways 1 EB SR 526 to NB I-5 Interchange EB 526 to NB 1-5 1/92 3/94 $2,000,000 WSDOT 1 <br /> nterstates and Freeways 2 EB SR 526 to SB 1-5 HOV Lane Evergreen Way to 128th Street 11/93 3/94 $2,500,000 WSDOT 2 <br /> nteretates and Freeways 3 1-5 HOV Lanes 164th to SR 526 5/97 8/97 2/98 $25,000,000 • WSDOT 3 <br /> nterstates and Freeways 4 41st Street Ramp/Interchange Broadway to Interstate 5 5/97 2/98 $1,500,000 • WSDOT 4 <br /> nterstates and Freeways 5 HOV Treatment of SR 96/1-S interchange 129th Street S.E./t-5 interchange 3/94 6/95 $1,800,000 WSDOT 5 <br /> nterstates and Freeways 6 Interchange Studios and Improvements 1.5/12th;1.5/Psolflo;SR 526/Evergreen_ 2/97 5500,000 • EVT 6 <br />'rincipal Arterials 1 SR 525/Paine Field Blvd.Projects SR 526 to SR 99 12/91 5/95 3/96 $69,000,000 • WSDOT 7 <br />'rinclpal Arterials 2 19th Avenue SE(SR 527) 112th Street to 132nd Street 1/93 9/96 3/97 $7,300,000 • EVT 8 <br /> 'rincipal Arterials 3 Evergreen Way 75th Street to SR 526 1/94 11/94 5/95 $597,000 EVT 9 <br /> 'rincipal Arterials 4 Evergreen Way Madison to 75th Street 1/94 11/94 5/95 $1,059,000 • EVT 10 <br /> 'rincipal Arterials 5 West Marine View Drive 10th Street to 18th Street 2/95 7/95 3/96 $1,996,000 EVT 11 <br /> 'rincipal Arterials 8 Evergreen/Casino Improvements SR 526 to Fred Meyer 1/94 6/95 $375,000 EVT 12 <br /> 'rincipal Arterials 7 Evergreen Way 52nd Street to Madison 1/98 6/98 5/99 $2,741,000 • EVT 13 <br /> 'rincipal Arlerlala 8 East Marine View Drive Alverson Bridge to N.Broadway 9/94 5/95 10/95 $2,862,000 * EVT 14 <br /> 'rincipal Arterials 9 Airport Road HOV Lanes Casino Road to SR 99 10/94 1/95 3/96 $4,450,000 SNO CT 15 <br />'rincipal Arterials 10 Everett Ave/SR 2 On-ramp Study Everett and Walnut;EB SR 2 2/97 $558,000 • WSDOT 16 <br /> 'rincipal Arterials 11 Everett Avenue Improvements _Norton Avenue to Waterfront 3/98 5/99 $1,900,000 • EVT 17 <br /> 'rincipal Arterials 12 East Marine View Drive _N.Broadway to 1-S 3/98 5/99 $1,000,000 • EVT 18 <br /> 'rincipal Arterials 13 Muk.Blvd./41st St.Corr./Ped.Study Broadway to Dogwood/Olympic 2/96 $100,000 • EVT 19 <br /> 'rincipal Arterials 14 41st Street Rucker Ave.to Friday Ave. 5/95 8/95 2/96 $2,000,000 * EVT 20 <br /> Principal Arterials 15 Arterial Needs Study Seaway,Broadway,112th,etc. 5/97 $250,000 • EVT No map <br /> 'rincipal Arterials 16 Paine Field Blvd.Ext.Study/Multimodal Fac._SR 526 to Mukilteo waterfront 6/94 $400,000 MUK 21 <br /> 'rincipal Arterials 17 SR 525 HOV Lanes SR 99 to 1-5 3/93 10/95 _ $10,100,000 • WSDOT 22 <br /> Principal Arterials 18 SR 98 NOV Lanes +1-5 to Dumas Road _ 3/95 4/96 6/97 _ $3,000,000 SNO CT 23 <br /> 'rincipal Arterials 19 SR 99 NOV Treatment SR 526 to SR 525 3/97 3/98 $1,000,000 * SNO CT 24 <br /> Minor Arterials 1 Madison Street East Cady to Rainier 2/93 12/94 5/95 $300,000 EVT 25 <br /> Minor Arterials 2 112th Street 1-5 to SR 525 2/93 1/96 3/97 $15,700,000 • SNO CT 26 <br /> Minor Arterials 3 100th Street SE 19th Avenue to 35th Avenue 4/94 9/95 6/97 $1,700,000 SNO CT 27 <br /> Minor Arterials 4 4th Avenue West Hardeson Road to Holly Drive 9/2000 $100,000 • SNO CT 28 <br /> Minor Arterials 5 Seaway Blvd. 75th Street to 36th Street 2/97 9/97 5/98 $2,000,000 * EVT 29 <br /> Minor Arterials 6 100th Street SW Airport Rd to Evergreen Way 2/2000 5200,000 • SNO CT 30 <br /> Collector Arterials 1 75th Street Improvements Beverly Blvd.to Beverly Lane 6/97 10/97 4/98 $100,000 • EVT 31 <br /> Collector Arterials 2 Collector Arterial Needs Study Various Locations 4/97 $50,000 • EVT No map <br /> Collector Arterials 3 Riverside Industrial Park Access Bridge Vicinity of 1-5 and E.Marine View Dr. 11/94 1/95 7/95 $5,400,000 • EVT 32 <br /> 'ocal Access 1 Annual Street Overlays Various streets within city 5/94 $6,500,000 EVT No map <br /> _ocal Access 2 Neighborhood Mitigation Signals Various locations within city 3/93 9/94 3/95 $250,000 EVT 33 <br /> _ocal Access 3 Neighborhood Mitigation Projects Various locations within city 5/94 52,083.000 EVT 34 <br /> _ocal Access 4 Boeing Mitigation P/R Lots Various locations within city 2/94 5/94 $1,129,000 EVT No map <br /> _ocal Access 5 Pedestrian Improvements Various locations within city 1/95 5/95 $300,000 EVT No map <br /> _ocal Access 6 Neighborhood Block Grants Various locations within city 1/95 5/95 $360,000 EVT No map <br /> l_ocal Access 7 Pavement Marking Projects Various locations within city 1/95 5/95 $480,000 EVT No map <br /> Focal Access 8 Everett Avenue Signals Various Everett Avenue Signals 1/93 8/93 $600,000 EVT 35 <br /> Focal Access 9 Signal Master&Interconnect Various locations within city 5/95 $450,000 EVT No map <br /> ocal Access 10 Interim Traffic Signals Various locations within city 1/95 6/95 $900,000 EVT No map <br /> .ocai Access 11 HES Signal Improvement 19th Avenue SE and 110th Street SE 3/93 10/93 $20,000 EVT 38 <br /> ,ocal Access 12 Developer Signals Various locations within city 5/94 $7,000,000 • EVT 37 <br /> Local Access 13 HES Projects Various locations within city 2/94 8/94 $404,000 * EVT 38 <br /> _ocal Access 14 Roadway Hazard Elimination Various locations within city 5/95 $120,000 * EVT No map <br /> _ocal Access 15 Neighborhood Traffic Studies Various locations within city 2/95 $70,000 • EVT No map <br /> .ocal Access 16 Regional Trail System Various locations within city 3/93 10/93 3/95 $1,305,000 • EVT 39 <br /> .ocal Access 17 Community Trail System Various locations within city 3/99 $200,000 • EVT 40 <br /> ..ocal Access 18 Neighborhood Trail System Various locations within city 2/95 5/95 10/95 $150,000 EVT No map <br /> _ocal Access 19 City Entryway Landscaping and Signs Entryway corridors within city 3/95 7/95 $150,000 • EVT No map <br /> transit Projects 1 Paratransit Vehicle Replacements;1996 N/A $120,000 ET No map <br /> transit Projects 1 Bus Replacements;1995-1996 N/A $2,700,000 ET No map <br /> transit Projects 1 Bus Replacements;1999 N/A $4,500,000 ET No map <br /> franait Projects 1 Paratransit Vehicle Replacements:1997-2000 N/A $715,000 * ET No map <br /> Transit Projects 1 Transit Operating Assistance N/A $1,500,000 • ET No map <br /> transit Projects 2 Buses for Service Expansion;1995 N/A $259,000 ET No map <br /> i transit Projects 2 Transit Facility Improvements N/A $100,000 ET No map <br /> transit Projects 2 Regional Pass System Planning N/A 2/95 $150,000 METRO No map <br /> transit Projects 2 Buses for Service Expansion;1997-2000 N/A $6,630,000 • ET No map <br /> transit Projects 2 Bus Stop Improvements N/A $200,000 • ET No map <br /> Transit Projects 2 Bikes on Buses Program N/A $25,000 ET No map <br /> Transit Projects 2 Security Equipment N/A $100,000 • ET No map <br /> Transit Projects 2 Electronic Farebox Equipment N/A $200,000 • ET No map <br /> transit Projects 2 Fixed Route Automated Computer Scheduling N/A $25.000 • ET No map <br /> transit Projects 3 Operations Support Vehicles N/A 560.000 • ET No map <br /> frensit Projects 3 Transit O&M Facility 7/99 $1,700,000 • ET No map <br /> 10V Projects 1 Multimodal Transportation Facility,Phase!! Not yet determined 6/95 6/95 $2,650,000 ET No map <br /> 10V Projects 1 Multimodal Transportation Facility,Phase!! Not yet determined 6/95 6/95 $4,675,000 • ET No map <br /> 40V Projects 2 Multimodal Transportation Facility,Phase ill Not yet determined 7/97 $20,000,000 • ET No map <br /> 10V Projects 2 SR 99 North Transit Priority Project SR 99 $375,000 ET No map <br /> 10V Projects 2 SR-99 Tranelt/HOV Treatment SR 99 7/99 $4,880,000 • ET No map <br /> 10V Projects 2 Evergreen Way Transit/HOV Treatment Evergreen Way _ 7/99 $5,685,000 • ET No map <br /> 10V Projects 3 Park and Ride Facilities Various Locations $4,500,000 • TBD No map <br /> 1OV Projects 3 Transit Centers 7/99 $4,000,000 • ET No map <br /> TDM Projects 2 Innovative Employer Programs N/A 7/95 $200,000 ET No map <br /> TDM Projects 2 Increased Rideshare Subsidies N/A 7/95 $98,000 ET No map <br /> rDM Projects 2 Everett CTR Program N/A $190,000 ET No map <br /> TDM Projects 2 Implementation of State CTR Law N/A $150,000 ET No map <br /> Von-motorized Projects 1 Bicycle and Pedestrian Plan Various Locations 7/95 5100,000 ET No map <br /> 3811 Projects 2 Regional Transit Rapid Rail $1,000,000 • RTA No map <br /> IA portion or all of the funding for these projects has not yet been committed. r <br /> NOTE:Projects shown in bold type were not included In the 1994-1999 Slx-year TIP. <br /> GStipsum.wgl <br />