My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/07/15 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/07/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 5:44:13 PM
Creation date
7/23/2015 11:53:46 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/15/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br />PROJECT TITLE: <br />8 <br />Professional Services <br />Briefing <br />COUNCIL BILL # <br />Expenditure Required <br />Agreement with Aspect <br />Proposed Action <br />Originating Department <br />Public Works <br />Consulting, LLC to provide <br />Consent <br />Contact Person <br />Amie Roshak, PE <br />geotechnical engineering <br />Action <br />Phone Number <br />425-257-7429 <br />design services for Puget <br />First Reading <br />FOR AGENDA OF <br />7/15/15 <br />Sound Outfall 4 Sewage <br />Second Reading <br />Separation Project <br />Third Reading <br />Public Hearing <br />Budget Advisory Initialed by: <br />Department Head <br />IN <br />CAA <br />Council President <br />n <br />Location <br />Preceding Action <br />Attachments Department(s) Approval <br />Lower Norton Avenue <br />Two Signed PSAs, Public Works, Legal <br />near West Marine View <br />Location Map <br />Drive, between 22"d and <br />25th Streets <br />Amount Budgeted <br />$1,000,000 <br />Expenditure Required <br />$11,855 <br />AccountNumber(s): UP 3621 <br />Budget Remaining <br />$988,145 <br />Additional Required <br />-0- <br />DETAILED SUMMARY STATEMENT: <br />Puget Sound Outfall 4 currently receives combined sewer overflows from CSO regulators and separated stone water <br />from SR529 and a former Kimberly Clark (K/C) parking lot. The project includes installation of 1,200 linear feet of <br />new sewer pipe within the City limits along Lower Norton Avenue between 22nd Street and 25th Street. A new <br />sewer main is needed to divert flows from the existing outfall and discharge flows to Lift Station No. 6. The <br />existing outfall pipeline will remain in place as a surface water outfall, for use by the KJC property. <br />City staff will be designing this project in-house this year, however, will need geotechnical information in order to <br />prepare contract plans and specifications for bidding in Spring 2016. The geotechnical consulting engineer selection <br />was the result of requesting proposals from three firms off the statewide consultant roster who have done work with <br />the City in the past. <br />RECOMMENDATION (Exact action requested of Council): <br />Authorize the Mayor to sign a Professional Services Agreement with Aspect Consulting, LLC to provide <br />geotecluiical engineering design services for Puget Sound Outfall 4 Sewage Separation Project in the amount <br />of $11,855. <br />51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.