My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/07/15 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/07/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 5:44:13 PM
Creation date
7/23/2015 11:53:46 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/15/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett <br />June 26, 2015 Project No. 150135-2 <br />Week 3 (W/E August 14): The City approves our Work Plan, issues a Street Use Permit, and <br />approved Traffic Control Plan. Assumes the City turns this around within I week. <br />Week 4 (W/IE August 21): Our field exploration is complete. The field work will be completed in a <br />single day. <br />Week 5 (W/E August 28): Aspect will provide the City with a written summary of conditions <br />encountered in the cores/borings. <br />Week 6 (W/E September 4): Geotechnical laboratory testing is complete, geotechnical analyses <br />are performed, and our Draft Geotechnical Report is prepared and submitted by Friday, September <br />4. <br />Week 7 (W/E September I1): the City provides review comments on the Draft Geotechnical <br />Report. Assumes the City turns this around within 1 week. <br />Week 8 (W/E September 18): Comments are addressed and our Final Report is submitted on or <br />before Friday September 18. <br />Contract Terms and Conditions <br />We are prepared to contract with the City of Everett using your standard consulting services <br />agreement. <br />Closure <br />We appreciate and thank you for the opportunity to provide this proposal for geotechnical <br />engineering support. Please contact the undersigned if you have arty questions or would like to <br />discuss our proposal in more detail. <br />Sincerely, <br />Aspect consulting, LLC <br />Erik O. Andersen, P.E., P.Eng. <br />Senior Associate Geotechnical Engineer <br />eandersen@aspectcoiisultiiac,.com <br />Attachments: <br />Cost Estimate Worksheet (1 page) <br />Aspect Approved Overhead Calculation (1 page) <br />Aspect Statement of Qualifications for Utility Projects (1 page) <br />Page 3 <br />66 <br />
The URL can be used to link to this page
Your browser does not support the video tag.