My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 3930
>
Resolutions
>
Resolution 3930
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2017 11:54:34 AM
Creation date
4/13/2017 11:54:30 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
3930
Date
3/30/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 . The City of Everett prohibits outdoor burning. No fires for <br /> the purpose of disposing of construction debris will be <br /> allowed. Fire safety practices during construction must be <br /> in compliance with Article 87 of the Uniform Fire Code. <br /> 13 . Detailed drawings in accordance with City Design and <br /> Construction Standards shall be submitted to the Public <br /> Works Department showing site parking layout, landscaping, <br /> utilities, storm drainage, temporary construction erosion <br /> control, and all required improvements in the public right- <br /> of-way. Public Works Department approval of these drawings <br /> is required prior to any permits being issued. All <br /> improvements shall be completed, approved and warranted <br /> before Final Plat Approval. <br /> 14. Forty-two feet of right-of-way is to be dedicated to the <br /> City for street purposes for the new street within the <br /> proposal. <br /> 15. The new street must be 28 feet wide curb to curb with <br /> sidewalk on both sides. <br /> 16. Full standard half street improvements, including but not <br /> limited to curb, gutter, and sidewalk, are required to the <br /> full frontage on 112th Street SW and Hollowdale Place per <br /> City Design Standards. <br /> 17. All lots must take access from the new public street except <br /> for lots 13 , 33, and 34. This must be noted on the final <br /> plat map. <br /> 18. Signs stating "No Parking" must be provided within the <br /> circumference of the cul-de-sac as directed by the City <br /> Engineer. <br /> 19. The construction plans must be designed from a site survey <br /> performed by a licensed state of Washington land surveyor. <br /> 20. Soil compaction testing shall be performed throughout the <br /> construction of the public street and utilities. Density <br /> curves shall be submitted to the Public Works Department <br /> prior to permits being issued for any aspect of the project. <br /> All work performed by the geotechnical engineer or testing <br /> lab shall be reported directly to the City Public Works <br /> Inspector before covering work can be continued by the <br /> contractor. Daily reports shall be kept by the soils <br /> investigator/tester and submitted to the Public Works <br /> Inspector within 24 hours. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.