Laserfiche WebLink
LNGINPERING �PLCIFICATION� <br /> ��AVATIQLI�qACKPi�-L h WASTEHAUL- CotiliIlll.sd <br /> oc,�mmodnle the «furn to normal use o� �he trcnch nrca. Pipe Inying ehnll <br /> ceoee when clennup if delnyed. <br /> Clennup shall be compleled an nl� sectione of woter moin instolled before <br /> the Conmctor will rcceive full paYmen� o� �he pipe nctunlly inetalled. <br /> TFe Contraclor ehnll remedy, ot hie expenee, ony defecte Iho1 appeor in Ihe <br /> backfill prior to finnl oceeptonce of the work nnd nl�o prior to terminotion <br /> of �he porformonce bond. Such repoir work reqUireA becaufe of defeclivt <br /> backfill ehell include replacement of �he domnged eurface improvemente, <br /> whethor Ihoee eurfece improvemente v�ere provided under thie Contract or <br /> by other Contrecte. <br /> � Onekfill ndjncent to strucluref shnll be ploced nnd compncled urifornily in � <br /> auch monner ne lo prevent wedging action or eccenlric loodi��g upon or <br /> oguinet the �trucluree. Slope� bounding or within areoe to be backfilled <br /> eholl be ftepped or serreted lo prevent �liding af the fill. During <br /> bockfilling operntion� ond in Ihe formation of embenkmtnle, equipoment <br /> thot will overlond the elructure i� Dnssing over nnd compocting the�e fills <br /> 9h��� 1101 bC USGd. <br /> included ae port of excavotion, backfill nnA wnetehnul ehnll be eaf�ting <br /> roadwny gr�ding. Groding �hnll con3ist af restoring existing roadways nnd <br /> shoulders to Ihe originol xmooth contoun. <br /> The cost af excnvn�ion, bnckfill nnd wastehnul ehall 6e included in �he unit <br /> �. Drice bid for pipc, fire hydronte and rela�ed nppurtenoncee, and alructuree. M� <br /> The unit price 6id wiil include oll work incidenlnl lo unclneeified <br /> e�cnvo[ion, dewn�ering, bnckfilling, compocling, wo�tehoul of excess <br /> moleriole, grading, reelorotian of drainnge fncililiee, inetnllntion ond <br /> mninlenonce of oll temporary repnir, clennup nn nll olher nf�ocioled <br /> excavetion nnd bnckfill items not olherwiet epecified thn� will reeult in <br /> camplete reetoretion af Ihe canetruclion nren lo i1s originnl m belter <br /> condition ne epccified hercin and further indicated on �he Plona. <br /> Soecini Gxcovntion of Un�uitoblt Materinl. Trcnch [xcavatinn <br /> In Ihc event thnt the Engineer direcls the Conlroclor lo eaenvete lo n dep�h <br /> in excen of lwo feel (2') bclow lhe tronch subgrnde, Ihen Ihie eddilionnl <br /> ucnvntion for pi0e nnd etrnctures ins�ntl�tion ehell be poid at the unit <br /> price bid for eD«�o� ezcnvn�ion of uneuiioble mnterial. Over•exenvn�ion up <br /> to two (2) feet below Ihc trench aubgrnAe ehnll bo included in �he unil pricc <br /> bid for founA ition grevel, end ehall include the coet of dewalering, if <br /> neressnry, nnd hnuling lo wo��e of nll �he unfuiinbie mnteriel. <br /> The unit price bid for fpecinl eacnvntion of uneui�oble moteriel, �rench <br /> excavotion, in exce�s of �wo feet bolow Ihe trench eubgrnde,u diree�td by <br /> R47•� <br />