Laserfiche WebLink
At�,n: 1�1r.Tony Vivolo, P.E. w'-a�)a(� 01 <br /> � � y June 16, 19RR <br /> p � Page 6 <br /> C H <br /> Y � N <br /> M � <br /> O C O <br /> � N H <br /> � � � recommendations. We akn rccommend w�e tx relilined to e�•aluate the preparation of ring <br /> o r footing and tank bouom plate suhgradcs to confirm that they are in the iutended txaring <br /> � �a strawm,and to monitor the iustallation of drains and compaciion o(Swctural Fill. <br /> �� H � �i'�1ITAT'IO�S <br /> o y The analyses,conclusions,and recommendauons contained in this re�rt are Lased on site <br /> r� conditions as they presendy exist and funher assume that the tcst pits are represenaitive of the <br /> � subsurface conditions across the site,i.e.,the subsurface conditiuns everywhere are not <br /> � "vi significandy different from those disclosed by the explorations. lf,during conswction, <br /> subsurlace conditions different trom those encoumered in the test pits are observed or appear <<� <br /> be present beneath exca�•ations,w�e s;iould be advised at once so diat we cnn re��ew these <br /> conditions and reconsider our ttcommeedations where necessary. If there is a substanti�l lapsc <br /> of time between the submission ot this rcport and the start of work at the site,or if conditions <br /> have changed due ro natural causes or conswcuon operations at or adjacent to the siie, it is <br /> recommended that this repon be reviewed to detertnine the applicability o(the conclusiona ai�d <br /> recommend�tions considerirg the changed condiuons and time lapse <br /> This re{wrt was prepared for the exclusive use of the Oµner and/or Engineer in the dc�ign o( <br /> the subject facility. It should be made available to prospect r,ontractors and/or the Contracior <br /> for infomiation on facmal data only and not as a warranty of subsurface conditions,such as <br /> those interpreted from thr tesr pit logs and discussiens o(subsur(ace conditions included in this <br /> ��.�- report. <br /> � Unanucinated soil condiuons art commonly encountered and cannot be fully detemiined b} <br /> i merely 4J:ing soil sunples. Such unexpecied conditions Crequently require thai addnional <br /> � '�,� expendimres be made io obtain a properly conswcred project;therefore,some conungency <br /> � �� Fund is recommended to accommcxi�te such�tential exva costs. <br /> w'e appreciate the opponunity to he of service. <br /> � 1_� SIIAtiNON & �1'11.SON, II�G r ��,�,� <br /> �. '� ���°� 'wn.�'�9 <br /> G <br /> �Q� y� , '� �. <br /> C � .t�r�.� � � <br /> a � <br /> "`� R2 ph . Boirwn, P.E. <br /> Associate t <br /> � � <br /> Encl: Figures 1 ihrough 11 UAf S�p��(NV���� <br /> �I � �.rr.i+N <br /> � • <br /> ����� � <br /> � <br /> M I <br /> �ti <br /> SH.4NNON 8 N'ILSON. INC i <br /> .• I <br /> I <br /> I <br />