Laserfiche WebLink
DIVISIuN / <br />MUISTURE PROTLCTLON AND L-NAIAIIO.N <br />BUILT-UP ROUFINC - 7.00 <br />A. SUB -CONTRACTOR l'o be expert.uecd, have adogtiate trained mechanics and <br />proper equipment to perform the work and approved by roofing material <br />manufacturer and Architect. <br />B. MATERIAL DELIVERY AND STOILA(.IDeliver materlalb in original tartans, <br />rolls, containers, with manufacturer's labels thereon. Store roof insu- <br />lation and roofing felts on pallets oil tho ground and/or root deck; <br />azure rolls of Celts on and. Protect materials from weather until <br />Installed. <br />C. GUARANTEE Work in this section shall be guaranteed for a period of two <br />(2) years. <br />D. MATEkIALS <br />1. Materials Per l00 Sg. Fk of Roof Area <br />e, Sheathing PaPcr - rosin sized - I layer. <br />b. Felts - .1-M Planet Base Felt - I laver <br />J-M Asphalt Saturated Felt - l layr.r <br />No. 80 Flexstone Mineral Surface Asbestos <br />Cap Sheet - I layer <br />C. Bitumen - J-M 190 Asphalt - 40 lbs. <br />d. Nailing - All nails or other tasteners are to be driven <br />through tin caps unless the nail or fastener <br />has an integral flat cup no less than 1" across. <br />e. Bitumens - J-M 190 Asphalt must not be heated above 450°F. <br />and is applied at temperatures between 350' F. <br />and 425° F. <br />E. APPLICATION OF ROOFING One -ply of rosin -sized sheathing paper nailed <br />to roof deck. <br />One layer of J-M Planet Bave Felt starting at the low edge either <br />parallel or perpendicular to the slope and lapping each course 4" over <br />the preceding our. Nail th, la,.s ,it 9" ,enters and down the longitudinal <br />center of each toll nail two r..w::­f nails with the rows spaced approxi- <br />mately 11" apart and nails staggered on approximately 18" centers. Use <br />nails or fasteners appropriate to the type of deck. Sprinkle mop over <br />plywood decks. <br />One 18" wide layer of J-M Asphalt Sattu at"d 1,It then continue with full <br />36' widths, lapping each course 2" over the precuding one. Mop the full <br />width under each felt with asphalt at a minimum rate of 20 Ibs. per <br />! square. <br />