Laserfiche WebLink
r • _ - . _ - __ ' __ . . ' _'__ ._ _ _. . ._ <br /> I Sky Valley Testing, LLC a'e: ° : <br /> � P.O. Box 8�5 • 03/07/13 1341 <br /> Monr��e, 11'A y8272 � � oa of Week: Time On Site: <br /> , — --- -- -- ----- — Thursday 2.5 <br /> Job Name 8 Location: Weather: Drive Time: <br /> � 100th ST Project Cloudy 1.0 <br /> T Mileage: Total Houra: <br /> 1400 Block of t001h St. Everett WA 40 3,5 <br /> Observation Cato o Contractor: Fortnan: <br /> Tri Terra Mike <br /> Test Point Test Location Fill Elevation Moiature Dry Densiry Max. Dry Compaction <br /> Number Depth (ft.) Feet Content •k) ( en Denal ( c Percenta e <br /> 9 Bu�ldmg Pad 1 FTG S G 14 9 106 111 5 95% <br /> �0 Bwlding Pad 1 FTG S G 13 8 107 111 5 96% <br /> 11 Build ng Pad 1 FTG S G B 7 126 128 0 98% <br /> 12 �udding F'ad 1 FTG S G 11 2 722 128 0 95% <br /> 13 Bwlding P;id 2 F TG S G 9 7 125 128 0 98% <br /> 14 Bwlding Pad 2 F TG S G 10 4 123 128 0 96% <br /> 1 5 Builtlmg aad 2 FTG S G 9 2 125 128 0 98% <br /> 16 Building P�d 2 FTG S G B 8 126 128 0 98% <br /> NOTES: <br /> Additional building pads have been excavated on east zide for Lots 1 & 2. bottom of � <br /> pads are 2-4' below existing grade. Probed bots lots and was only able to penetrate <br /> sub grade a couple of inches. Also took addttional comoaction t^st and found footing <br /> sub grade well compacted with test results shown above. Currently contractor <br /> � <br /> locatinp, side sewers installed back in the 1970's. <br /> I <br /> I <br /> � Geolech in Field <br /> I Jerry Boyd <br /> – --- 1— - --- -- \ <br /> Sky Valiey Testing, LLC Soil Consultantsl Geotechsl Compaction Testing (206) 949�d9�8 ,, + � � <br /> � �� <br /> \ ' <br />