Laserfiche WebLink
1 <br /> 1I � <br /> 1 ' ( I <br /> Sky VaU�y Testing, LLC o2rni�3 �sa� <br /> �'•U• �;Ox �,35 •� a o sec: ms n te: <br /> A1onrc�c, WA q8272 <br /> -- Thursday 4.0 <br /> Job Name 8 ocat on: eat er. rlve Ime: <br /> 100th ST Project Overcasl �•0 <br /> 1198 B: 018 OUIs: <br /> 1400 Block of 100th St, Everett WA 40 5.0 <br /> Observatlon ate o Contractor: Forman: <br /> Tri Terra Mike <br /> Test Polnt Teat Locetton FIII Elevatlon oleture Dry Densiry Maz. Dry Compactlon <br /> Number De th (ft. Feet Content °� e Densi c Pereente e <br /> � E31dg P�d 3 FTG S B 9 6 i23 12B 0 96% <br /> 2 Bltlg Pad : FTG S B 8 1 124 128 0 97% <br /> 3 Bldg Pad 3 FTG S B 10 9 122 128 0 9.r+% <br /> 4 Bld Pad 3 FTG S B 10 8 123 128 0 96% <br /> j Bldg Pad 4 FTG S B 11 1 122 12B 0 95% <br /> 6 Bldg Ped 4 FTG S B 10.4 124 12B 0 97% <br /> 7 Bldg Pad 4 FTG S B 8 8 125 12b 0 98% <br /> 8 Bldg Ped 4 FTG S B 11 0 122 128A 95% <br /> NOTES <br /> . _. . . ___.--- ---- . -_ . - ------ -- ---� <br /> Contractor excavating for building pad on south side of 100th St. between Airport <br /> IWay and Hwy 99. Building pad being excavated down 2-5' below existing grade. <br /> �� Currendy just have building pad 3 & 4 excavated down into firm soils. Checked <br /> ' compaction in footing sub grades a�d found compaction at least 959'a. Location of <br /> � <br /> density tests are shown on enclosed sketch. I <br /> i <br /> Geolech in Field <br /> —_� Jerry Boyd <br /> Sky Valley Testing, LLC Soil Con�ultaoGl Geotechsl CompocUon Tasting (I06)9�9-1978 <br /> 1 <br /> � <br /> � <br />