Laserfiche WebLink
�� ��� <br /> Sky Vallc,y Testing, LLC o2�z�n3 �3a� <br /> �'•��• �;�'� H;iS .� Da� o eek: Tlma n Site: <br /> Atcmr��c, �1':1 yH•�7z <br /> —__— Thursday 4.0 <br /> Job Name S l.ocatlon: eather: rive Tlme: <br /> 100th ST Project Overcast 1.0 <br /> Mllea e� ToWI Houn: <br /> 1400 Block of 100th St, Everetl WA 40 5.0 <br /> Observatlon Cate o Controctor: Fortnan: <br /> Tri Terra Mike <br /> Test Polnt Teat Locetlon FIII Elevatlon Molstun• Dry Denslty Max. Dry Compacllon <br /> Number De th (ft. Feet Content(°h c Densl c Percente e <br /> 1 Sldg Pad 3 FTG S B 9 6 123 ti8 0 96% <br /> 2 Bldg Pad 3 FTG � 0 B 1 124 12B C _ 97% <br /> 3 Bltlg Pad 3 _ FTG S B 10 9 122 128 0 95% <br /> 4 Bldg Pad 3 FTG S 8 10 6 123 12d 0 96% <br /> 5 Bldg Fetl 4 PTG S B 11 1 122 128A 95% <br /> 6 21dg Pad 4 FTG S B. 10.4 124 120 0 97% <br /> 7 Bldg Pad 4 FTG S B B B 125 128 0 98% <br /> H Bldg Pad 4 FTG 5 B 11 0 127 128 0 95% <br /> MOTF.S:� <br /> i --- <br /> � - - - --- - -- �---- - ---- __.----- ----------�---- ----- <br /> Contractor excavating for building pad on south side of 100th St, between Airport <br /> Way and Hwy 99. E3uilding pad being excavated down 2-5' below existing grade. <br /> Currently just have building pad 3 & 4 excavated down into firm soils. Checked <br /> compaction in footing sub grades and found comp�ction at least 959'0. Location of <br /> den,ity tests are shown on endosed sketch. <br /> I <br /> � Geotech in Field <br /> Jerry Boyd <br /> Sky Valley Testing, LLC Soll ConeWtantel Geotechsl Compectloo Te�Uog (4061 �9-4938 � <br /> � � <br />