Laserfiche WebLink
/ • <br />�� <br />�Tr�pani�r En9in�ering <br />Mo%� nal Civil Engineering <br />����on�� <br />Decembar 11, 1991 <br />Job 91-076 DEC 12 1991 <br />City of Everett <br />Depertment of Public Worke <br />300? Wetmore Avenue <br />Everett, WA 9B201 <br />ATTN= Paul MeRea <br />ItE s <br />Gentlemens <br />_ . ................................................ _ <br />CITY OF EVERETT <br />ruae warha o�pt. <br />ROD HILLIS COST ESTIMATE <br />DRIVEWAY AT 104th WEST OF 7th AVS. B.E. <br />Per discuesione with our cliant, plee�ee ba advieed that the <br />coat to conetruct the driveway is epproximntely $1,650. The <br />breakdovm is es followe: <br />20 LF 66"x 51" (14 geuga CMP Arch) @$53.81/Ft � b1,076.20 <br />Backhoe - 4 houra @ $80.00/hour � 320.00 <br />Riprap - 20 yarde nt 512.00/c.y. � 240.00 <br />$1,636.20 <br />(Say $1,650.00) <br />With 20• continqency, the City ehould set the performence <br />bond at $2,000.00. <br />Thie aoet eetimate assumes 66"x 51" - 14 gauge CMP Arch Pipe <br />wi.th 3 x 1 corruqatione. The Nomogrnphs are attnched for <br />your uee. <br />Pleaee call if we can provida you with further information. <br />Sincerely, <br />Ted Trepnnier, P.B. <br />TT/th <br />Encloeure <br />ecs Rod Hillie <br />1420 Hewltt • Everetl, Washington 98201 • Everett (2061 259-5556 • FAl( (208) 269•5558 <br />