Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard �601. <br />6. Connect side sewer per City Standard #'s 607 , 602, 604. <br />7. Connect all rooRop downapouts to the side sewer. <br />�8,� Connect rooftop downspouts to the drainagb system provided for this �ot. <br />9. P,00ftop runoH must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length _. <br />10. The contractor must meet with the Public Works Inspector to discuss potential drainege <br />routing prior to beginning the project. <br />11 nstall erosion control measures as determined by the Publfc Works inspector, such es silt <br />fence, strew bales, swelea, or erosion blankets. <br />12. nstall erosion control measures per Ciry of Everett Standarda for small parcels <br />13. Remove erosion c�ntrol meesures upon complet(on o( the proJect prior to final approval of the <br />permit. <br />/ 1a. All excavated material trom foundation, sidewalk and driveways shall be hauled to en <br />�O approved, permitted site. No wnsting of material is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of Everett Standerd Plen #'s 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unuseid <br />driveways and any broken or damaged area must be replaced). <br />16. Inatall a Type I concrete driveway per City of Everett Standard q307. <br />17. Pave driveway from the front property line out to the streot paving. <br />18. ontact the � � ( Weter District for connecting provisions for this building's <br />water an� sewer services. <br />19. A catch basin es per Ciry Standard Plan k402 with a gas trap per Standerd Plan 8410 ia <br />required for the parking area. <br />20. If a sewer pump system is to be installed, the pressure Nne must diecharge Into e private <br />manhole, then gravity flow across the pubHc right-of-way. <br />21. A sprinkler system Is required for this building in compliance with the requirements of NFDA <br />Standerds 13D. <br />PWCanmenb „ L � <br />L/ <br />