Laserfiche WebLink
11/2/99 2:8:49 pm Lakeview Engineering Inc. page 2 <br />GURU SHORT PLAT <br />3TORM DRAINAGE ANSLYSIS AND CALCULATION3 <br />DfiTfiNTION VOLUMB PRIOR TO BAFETY FACTOR <br />���s�ss��ssa�sa�sssvssasa�aaa�ss���s�escwc�ss�sv�s�s�sv�s��sva��ai��� <br />BASIN Si]PMlARY <br />BASIN ID: AS <br />SBUH METHODOLOGY <br />TOTAL AREA.......: <br />RAINFALL TYPE....: <br />YRECIPITATION....: <br />TIME INTERVAL....: <br />NAME: 10 YEAR DEVELOPED <br />0.43 Acrea <br />TYPE'lA <br />2.25 inches <br />10.00 min <br />ABSTRACTION COEFF: 0.20 <br />PEAK RATE: 0.14 Cfe VOL: <br />BASIN ID: A6 <br />SBUH METHODOLOGY <br />TOT:�L AREA . . . . . . . : <br />RAINFALL TYPE....: <br />PRECSPITATION....: <br />TIME INTERVAL....: <br />SA3EFLOf9S : <br />ARfiA... <br />CN....: <br />TC..... <br />0.00 cfs <br />PBRV <br />O.il Acre6 <br />es.po <br />5.00 min <br />0.05 Ac-ft TIME: 480 min <br />NAME: 100 YEAR DEVELOPED <br />0.43 Acres <br />TYPElA <br />3.25 inchea <br />10.00 min <br />ABSTRACTION COEFF: 0.20 <br />PEAK RATE: 0.23 Cfe VOL: <br />BA3EFLOWB: <br />AREA... <br />c�r..... <br />TC..... <br />0.00 cfe <br />PERV <br />0.21 Rcres <br />85.00 <br />5.00 min <br />0.09 Ac-ft TIME: 480 min <br />IMP <br />0.22 Acree <br />98.00 <br />5.00 min <br />IMP <br />0.22 Acree <br />98.00 <br />5.00 min <br />