Laserfiche WebLink
J <br />CIABED Clt IfORR ORDSRB REPORT <br />Total Utility Maintenance Management System page 1 <br />03/28/1995 <br />aea�aa=aeaeaanaava��aeannae-��aa=anavaaaaaeeeenennaaevea-vaeva-veamavamnaa�maeea <br />Date Range :O1/09/1989 - 03/24/1995 <br />CM Work Order Range :1001091070001 - 8801086100085pa��e=n ?*401196751142 <br />Item Range :<Blank> - WW22�2o001 <br />Program ALL Function ALL Activity ALL <br />�=a�=�_�e��==eaaaaaae�aaasvaanaaca¢vaaaa�«�aan <br />aa�ca�aaaaacaaaaaeca=�=�--�--- <br />CM WORK ORDER ID: 7401196751142 Title: <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: WS1384R058 -- WATER SERVICE <br />Location ID: Function 119 <br />Program 740 <br />Date Completed: 03/14/1995 <br />overall Craft: <br />Issued: 03/OB/1995 <br />out of Service? NO <br />Mater Reading: <br />Downtime: 0 hours <br />status: <br />CONVERT 215 94TH ST SE <br />Activity 675 <br />Issued by: SKL Assiqned to: <br />Priority: Travel Time: o.00 Hr. <br />Labois <br />Craft ID Nama <br />UL SSJ SMITH� STEVE J. <br />WST WDT W�LDEN, DAROLD T. <br />Nat�rial�s <br />ID---------- <br />ADAP34000547 <br />BOX000056247 <br />COUP36145547 <br />ELIA34101447 <br />METE36089447 <br />NIPP34131647 <br />PIPE34060647 <br />VALV34008348 <br />Planned Hrs Actual Hrs <br />---- ----------- <br />---------- <br />0.00 3.00 <br />0.00 3.00 <br />Description __________ <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />BOX METER PLA 15" X 10" W/LID <br />COUPLING 1" CTS COMPX3/4" MIP@ <br />ELL 3/4" 90 DEG4BRNEPTUNE T-10 <br />METER 5/8" X 3/ . <br />NIPPLE 3/4" X 1 1/2" BRASS <br />PIPE 3/4" POLY I.P.S. <br />VALVE METER 9/4" IACK WING IP@ <br />Total Labor Coat: <br />Date <br />03/14/1995 <br />03/14/1995 <br />03/14/1995 <br />03/14/1995 <br />07/14/1995 <br />03/14/1995 <br />03/14/1995 <br />03/14/1995 <br />� Used <br />-------4 <br />1 <br />1 <br />2 <br />1 <br />1 <br />4 <br />2 <br />Total Material Cost: <br />v�hi.al�s: pgBcription Hours <br />ID ------------ ------ <br />------------ <br />------------------ 3.00 <br />V2117 91 CHEV 1-TON HYD UNIT <br />Total vehicle Cost: <br />Coet <br />16.80 <br />16.80 <br />Cost <br />45.09 <br />____ 60 24 <br />105.31 <br />Cost <br />30.36 <br />12.27 <br />6.23 <br />2.44 <br />27.84 <br />0.69 <br />0.96 <br />15.98 <br />---_-96.77 <br />Work Description: ---------------------------- <br />----��--�----- <br />-------------------------------- <br />PIETERA 30404499 <br />• <br />