My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
502 95TH PL SW 2016-01-01 MF Import
>
Address Records
>
95TH PL SW
>
502
>
502 95TH PL SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 10:36:10 PM
Creation date
4/14/2017 12:41:01 PM
Metadata
Fields
Template:
Address Document
Street Name
95TH PL SW
Street Number
502
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( <br />PJBLIC W��KS PERMIT COMMENTS <br />4. As per Public Wo�ks approved plan dated <br />5. Connect side sewer per Ciry Stenderd #801. <br />6. Connect side sewer per City Stendard #'s 601, 602, 604. <br />7. Connect all rooftop downspouts to the side sewer. <br />��innect rooftop downspouts to the drainage system provided for this lot. <br />9. Rooftop runoff must be discharged to a roof downapout infiltration syatem per Ciry of Everett <br />Storm Manual 3-2.8.2. Width __, Depth _, LengTh _. <br />10. A catch basfn as per Ciry Standard Plan #402 with s gas trap per Standard Plan H410 is <br />required for the parking area. <br />11. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan M's 305A <br />& 308 on this proposel's frontage as dire��ted by the PubBc Works Inspector (i.e. all unused <br />driveways and any broken or dameged area must be replaced). <br />12. Install a Type I ccncrete dr(veway per Ciry of Everett Standard p307. <br />13. Pave driveway from the front property Une out to the atreet paving, <br />14, ntact the Water Distr(ct for connecting provisions for this building's <br />ter and sewer services. <br />15. Ii a sewer pump system is to be instelled, the pressure line must diacherge Into a private <br />manhole, then gravity flow across the public right-of-way. <br />1 B. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />17. A sprinkler system is requfred for this building in compl(ence with tFie requirements of NFDA <br />Standards 13D. <br />Pwca�,e,,n <br />
The URL can be used to link to this page
Your browser does not support the video tag.