Laserfiche WebLink
PUBLIC WORKS PERMIT COMMEN � S <br />4. As per Public Works approved pla�i dated _ <br />5. Connect side sewer per City Standard #801. <br />8. Connect side sewer per City Standard N's 601, 602, 604. <br />7. Connect all rooftop downspouts to the side sewer. <br />8. Connect roottop downspouts to the dralnage :;yFtem provided `.x this lot. <br />9. Rooftop runoH must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Widih __, Depth _, Length _. <br />10. A catch basin as per Ciry Standard Plan #402 with a gas trap per Standard Plan rt410 is <br />required for the parking area. <br />11. Removt� and replace curb, gutter and sidewelk as per City ot Ev�rett Stendard Plan q's 305A <br />8 308 on this proposal's frontege as directed by the Public Works Inspector (i.e. all uniiaed <br />drivewriys and any broken or demaged area must be replaced). <br />12. !r�stall a Type I concreto driveway per Ciry of Everett Standard 1�307. <br />13. Pave driveway from the tront property line out to the stroet paving. <br />14. Contact the Water District for connecting provls(ons for th�s building's <br />weter and sewer services. <br />15. If a sewer pump s/stem is to be installed, the pressure line muat discharge into a private <br />manhole, then gravity flow across the public right-of•way. <br />16. The contr��tur must meet with ths Public Works Inspector to discuss poter�tial drainage <br />routing prior to beginning the project. <br />17. A sprinkler system is requirod for this building in complfance with tho requirements of NFDA <br />Standards 13D. <br />PWCommenls <br />