Laserfiche WebLink
PUiiLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard #601. <br />6. Connect sido sewer per City Standard ii's 601, 302, 604. <br />7. Connect ell rooftop downspouts to the side sewer. <br />�Conn ct rooRop downspouts tu the drainage system provided for this lot. <br />Rooftop runoff must be discherged to a roof downspout fntiltration system per City of Fverett <br />Storm Menual 3-2.6.2. Width _, Depth _, Length __. <br />10. A catch bas(n as per Ciry Standard Plan #402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />11. Remove and replace curb, gutter end sidewalk as per Cfry of Everett Standard Plan N's 305P, <br />& 306 on this proposal's frontage as dfrected by Ihe Public Works Inspector (i.e. all unuaed <br />driveweys and any broken or demaged erea must be replaced). <br />12. Install a Type I concrete driveway per Ciry oi Everett Stendard N307. <br />13. Pave driveway from the tront property Iine out to the street paving. <br />14. ontact the Water District for connecting provisions for this buildfng's <br />water and sewer services. <br />15. if a sewer pump system is to be installed, the pressure line must discherge into a private <br />manhole, then gravity flow across the pubHc right-of-way. <br />16. The contractur must meet with the Public Works Inspector to diacuss potential drainage <br />routing prior to beginning the project. <br />17. A sprinkler system is re auired for this building in compllence with the requlrements of NFDA <br />Standards 13D. <br />PWCommants <br />