My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
520 95TH PL SW 2016-01-01 MF Import
>
Address Records
>
95TH PL SW
>
520
>
520 95TH PL SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 10:32:10 PM
Creation date
4/14/2017 12:42:41 PM
Metadata
Fields
Template:
Address Document
Street Name
95TH PL SW
Street Number
520
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUiiLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard #601. <br />6. Connect sido sewer per City Standard ii's 601, 302, 604. <br />7. Connect ell rooftop downspouts to the side sewer. <br />�Conn ct rooRop downspouts tu the drainage system provided for this lot. <br />Rooftop runoff must be discherged to a roof downspout fntiltration system per City of Fverett <br />Storm Menual 3-2.6.2. Width _, Depth _, Length __. <br />10. A catch bas(n as per Ciry Standard Plan #402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />11. Remove and replace curb, gutter end sidewalk as per Cfry of Everett Standard Plan N's 305P, <br />& 306 on this proposal's frontage as dfrected by Ihe Public Works Inspector (i.e. all unuaed <br />driveweys and any broken or demaged erea must be replaced). <br />12. Install a Type I concrete driveway per Ciry oi Everett Stendard N307. <br />13. Pave driveway from the tront property Iine out to the street paving. <br />14. ontact the Water District for connecting provisions for this buildfng's <br />water and sewer services. <br />15. if a sewer pump system is to be installed, the pressure line must discherge into a private <br />manhole, then gravity flow across the pubHc right-of-way. <br />16. The contractur must meet with the Public Works Inspector to diacuss potential drainage <br />routing prior to beginning the project. <br />17. A sprinkler system is re auired for this building in compllence with the requlrements of NFDA <br />Standards 13D. <br />PWCommants <br />
The URL can be used to link to this page
Your browser does not support the video tag.