My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
525 95TH PL SW 2016-01-01 MF Import
>
Address Records
>
95TH PL SW
>
525
>
525 95TH PL SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 10:31:11 PM
Creation date
4/14/2017 12:43:11 PM
Metadata
Fields
Template:
Address Document
Street Name
95TH PL SW
Street Number
525
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c.� <br />PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plsn dated <br />5. Connect side sewer per Ciry Standard ri601. <br />6. Connect side sewer per City Stendard N's 601, 802, 604. <br />7. Connect all rooftop downspouts to the side sewer. <br />� Connect rooftop downspouts to the drainage system provfded for this lot. <br />9. Rooftop runoff must be dfschargecl to a rooi downapout inflltrat(on system per Ciry of Everen <br />Storm Manual 3-2.6.2. Wfdth _, Depth ,_, Length _. <br />10. A catch basin as per City Stendard Plan q402 with a gas trap per Stendard Plan N410 is <br />requfred for the parkfng area. <br />11. Remove and replace curh, gutter and sidewalk as per Ciry of Everett Standard Plan #'s 305A <br />8 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />12. Install a Type I concrete driveway per City of Everett Standard 1t307. <br />13. Pave driveway from the front property Hne out to the street paving. <br />14. Contact the ./(,�J (%�%���� Water �istrict for connectfng proviaions for this bullding's <br />water and sewer services. <br />15. If e sewer pump system is to be installed, the pressure Ifne must discharge fnto a private <br />manhole, then gravity flow across the public right-of•way. <br />� 6. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />17. A sprinkler system is required for this building in compliance with the requlrements of NFDA <br />Standards 13D. <br />l� ALL �c�Vb.7-C-.1� /�-li4TtQ �a-L Fc°2��y� l=c���u��T�oA <br />5 � Oe�t�ALK, [�.C'� ✓e���� J�LC �3C FI+1vLC.:�� To .•Fn..� <br />A-P�'2G�,���� .J E.2,> >; � J � i; F /Jo �:��-5,—t�,v c� c F ��I�rz-�'i.4L <br />� �� -1-�t� r�i'vic�vN�j .C.o % , <br />PWCamrnn <br />L__ <br />
The URL can be used to link to this page
Your browser does not support the video tag.