Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard #601. <br />l 6.� Connect side sewer per City Standard #'s 601, 602, 60�1. <br />✓ <br />7. Connect all rooftop downspouts to the side sewer. <br />8. Connect rooflop downspouts to the drainaoe system provided for this lot. <br />9. Rooftop runofl must be discharged to a roof downspout infiltration system per City o( Everett <br />Storm Manual 3-2.6.2. Width _, Depth __, Length _. <br />10. The contractor must meet with the Pubiic Worl�s Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />� <br />`11� Install erosion control measures as determined by the Public Works inspector, such as silt <br />,� tence, straw bales, swales, or erosion blankets. <br />12. Install erosion control measures per City of Everett Standards for smali parcels <br />�13 �Remove erosion control measures upon completion o( the project prior to final approval of the <br />permit. <br />�14 �All excavated material from founoation, sidew,3lk and driveways shall be hauled to an <br />approved, permitted site. No wasting of maten�l is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan �'s 305A <br />& 306 on this proposal's fronta,c,e as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />16. Install a Type I concrete driveway per Ciry of Everett Standard a307. <br />! 7. Pave driveway from the front property line out to the street paving. <br />1 C. Contact the _ Water District for connecting provisions for ihis building's <br />water and sewer services. <br />19. A catch basi� as per City Standard Plan #402 with a gas trap per Standard Pian �410 is <br />required for the parking area. <br />20. If a sewer pump system �s to be installed, the pressure line must d sch�rge into a private <br />manhole, then gravity flow across the public � ight-of-way. <br />�1, A sprinkier �ystem is required for this building �n compliance �.vith the requirements of NFDA <br />Standar.s 13D. <br />=r,r„--�.15 �`:� C� ��'j �r T til i L S� y�2 <br />