Laserfiche WebLink
PUBLIC WnRKS PERMIT COMMENTS <br />4. As per Pubiic Works approved plan dated <br />5. Connect sicle sewer per City Standard #601. <br />�_�Connect side sewer per City Standard #'s 601, 602, 604. <br />7. Connect all rooftop downspouts to the side sewer. <br />�/ Connect rooftop downspouts to the drainege system provided for this lot. <br />/ <br />9. Roc!top runoft must be discharged to a roof downspout infiltration system per City ot Everett <br />Storm Manual °-2.6.2. Width _, Depth _, Length _. <br />10. The contractor must meet with the Pubiic Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />1 �/Install erosion controi measures as determined by the Public Works inspector, such as silt <br />fence, straw bales, swales, or erosion blankets. <br />12. Install erosion control measures per City of Everett Standards for small parcels <br />13.)Remove erosion control measures upon completion oi the project prior to final approval of ?he <br />permit. <br />% <br />14.. All excavated material fron found_ iion, sidewalk and driveways shall be hauled to an <br />approved, permitted site. No wasting of material !s allowed nn this building lot. <br />15. 9emove and replace curb, gutter and sidewalk as per City of Everett St�ndard P�an #'s 305A <br />8 3�J6 on this proposal's frontage as diracted by the Public Works Inspector (i a. all unused <br />driveways and any broken or damaged area must be replaced). <br />i 6. Inctall a Type I concret� driveway per City oi Everett Standard #307. <br />17. Pave driveway from the iront property line out to the street paving. <br />18. Contact the Water District tor connecting provisions for this building's <br />water and sewer services. <br />19. A catch basin as per City Standard Plan i'402 with a gas trap per Standard Pl�n #410 is <br />required for the parking area. <br />20. If a seN�er pump system �s to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />21. A sprinkler system is required for this building in compliance with ;he requirements of NFDA <br />Standards 13D. <br />PWCcmrrenls <br />�2 <br />