My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2525 96TH PL SE 2016-01-01 MF Import
>
Address Records
>
96TH PL SE
>
2525
>
2525 96TH PL SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 9:59:16 PM
Creation date
4/14/2017 1:02:21 PM
Metadata
Fields
Template:
Address Document
Street Name
96TH PL SE
Street Number
2525
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per Ciry Standard #601. <br />� Connect side sewer per City Standard #'s 601, 602, 604. <br />l� <br />7. Connect all rooftop downspouts to the side sewer. <br />�Connect rooftop downspouts to the drainage system provided for this lot. <br />9. Rooftop runoH nwst be discharged •� a ruof downspout in}iltration system per City of Everett <br />Storm Manual 3-2.62. Width _, Depth _, Length _. <br />10. The contractor must meet with the Pubiic Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />lt�lnstall erosion conirol measures as determined by the Public Works inspector, such as silt <br />fence, straw bales, swales, or erosion blankets. <br />72. Install erosion control measures per City of Everen Standards for small parcels <br />13. Remove erosion control measures upon completion of the project prior to final approval of the <br />permit. <br />14. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br />approved, permitted site. No wasting of material is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan N's 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />16. Install a Type I concrete driveway per City of Everett Standard Ii307. <br />17. Pave driveway from the front property line out to the street paving. <br />18. Contact the Water District for connecting provisio�s ,,� !his building's <br />water and sewer services. <br />79. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across ihe public right-of-way. <br />21. A sprinkler system is required for this building in compliance with thP requirements of NFDA <br />Standards 13D. <br />vwcom�ms , �-', � t�� �i a� <br />� _ _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.