My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2623 96TH PL SE 2016-01-01 MF Import
>
Address Records
>
96TH PL SE
>
2623
>
2623 96TH PL SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 9:57:09 PM
Creation date
4/14/2017 1:03:57 PM
Metadata
Fields
Template:
Address Document
Street Name
96TH PL SE
Street Number
2623
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated _ <br />5. Connect side sewer per City Standard #601. <br />� Connect side sewer per City Standard k's 601, 602, 604. <br />7. Connect all rooftop downspouts to the side sewer. <br />�J Connect rooftop downspouts to the drainage system provided for this lot. <br />9. Rooftop runoff must be discherged to a roof downspout intiltration system per Ciry of Everett <br />Storm Manual 3-2.6.2. Width _, Depth __, Length _. <br />10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />�t'nstall erosion control measures as determined by the Public Works inspector, such as silt <br />'' fence, straw bales, swales, or erosion blankets. <br />12. Install erosion control measures per Cih� of Everett Standards for small parcels <br />�� Remove erosion control measures upon completion of the project prior to final approval of the <br />permit. <br />114.!Ail excavated material frorr� foundation, sidewalk and driveways shell be hauled to an <br />approved, permitted site. No wasting of material is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />16. Inotall a Type I concrete driveway per City of Evarett Standard #307. <br />17. Pave driveway from the front property line out to the street paving. <br />18. Contact the __ Water District for connecting provisions for this building's <br />water and sewer services. <br />19. A ca�ch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />20. If a sewer pump system �s to be installed, the pressure line must discharge into a private <br />manhole, then graviry flow across the public right•of-way. <br />21. A sprinkler system is required for this building in compliance with ihe requiremenis of NFDA <br />Standards 13D. <br />, <br />alveammems - <br />l <br />� ' �:1 � ��- `<�' /�l � r �z <br />
The URL can be used to link to this page
Your browser does not support the video tag.