Laserfiche WebLink
PUBLIC WOR!�CS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard #601. <br />(� 6J Connect side sewer per City Standard #'s 601, 602, 604. <br />l/ <br />7. Connect all rooftop downspouts to the side sewer. <br />� Connect rooftop downspouts to the drainage system provided for this lot. <br />�. Rooftop runoft must be discharged to e roof downspout infiltration system p3r City of Evere» <br />Storm Manual 3-2.6.2. Width _, Depth _, Length _. <br />10. The contractor must meet with the P�blic Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />1 l� Install erosion control measures as determined by the Public Works inspector, such es silt <br />fence, straw bales, swales, or erosion blankets. <br />12. Install erosion control measures per City of Everett Standards for small parcels <br />�13� Remove ero�'on control measures upon completion of the project prior to final approval of the <br />permit. <br />14. II excavated material from foundation, sidewalk and driveways shall be f�auled to an <br />approved, permitted site. No wasting of material is allowed on this building lot. <br />15. Remove and replace curb, gutter end sidewalk as per City of Everett Standard Plan �'s 305A <br />8 306 on this oroposal's frontage as directed h,y the Public Works Inspector (i.e. all unused <br />driveways and any broken or damar,ed area nust be repiaced). <br />16. Install a Type I concrete dr+veway per City of Everett Standard �• 307. <br />17. Pave driveway from the front property line out to the street paving. <br />18. Contact the Water District for connecting p�ovisions for this building's <br />water and sewer servicrs. <br />19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />20. If a sewer pump sys!em �s to be installe�, the pressure line must discharge into a private <br />manhole, then gravity flow across ihe public right-ot-way. <br />21. A sprinkler system is required for this buiiding in compliance with the �equirements of NFDA <br />Standards 13D. <br />� >_ <br />� `+�. � <br />.7 ; �/��- !/• / ' <br />_ „� , L <br />PWGomnvnl5 <br />