Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works epproved pian dated <br />5. Connect side sewer per City Stand�rd ti601. <br />��� Connect side ce.ver per City Standard iPs 601, 602, 604. <br />7. Connect all rooft �p downspouts to the side sewer. <br />� Connect rooftop downspouts to the drainage system provided for this lot. <br />9. Roottop runoff must be discharged to a roof downspout infiitration system per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length __. <br />10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />ro�ting prior to beginning the project. <br />�j� install errsion control measures as determined L� the Public Works inspector, such as silt <br />fence, straw bales, swales, or erosion blankets. <br />12. Install erosion control measures per City ol Everett Standards for small parcels <br />13 Remove erosion control measures upon completion of the project prior to final approval of the <br />permit. <br />� <br />l 141 All excavated materiel from foundation, sidewalk and driveways shall be hauled to an <br />� approved, permitted site. No wasting of ma!�rial is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. ell unused <br />dri. :ways end eny broken or damaged area must be replaced). <br />16. install a Type I c�ncrete driveway per City of Everett Standerd �307. <br />17. Pave driveway irom the front property line out to the street paving. <br />18. Contact the Water Dist�ict for connecting provisions for this building's <br />water and sewer services. <br />19. A catch basin as per City Standard Plen k402 with a gas trap per Stendard Plan #410 is <br />required for the parking area. <br />20. II a sawer pump system �s to be installed, the pressure line must discherge i��to e private <br />manhole, then graviry tlow acro�� the public right-of-way. <br />21. A sprinkfer system is reqwred for this building in compliance with the requirements of NFDA <br />Standards 13D. <br />�V1�0�1mE�15 <br />