Laserfiche WebLink
PJBLIC WORKS PERMIT COMMENTS <br />4 As per Public Works approved plan dated <br />5. Connoct side sewer per City Standard N601. <br />� Connect side sewer per City Standard #'s 601, 602, 604. <br />.� <br />7. Connect ali rooftop downspouts to the side sewer. <br />�� Connect rooftop downspouts to the drainage system provided for this lot. <br />9. Rooftop runoff must be discharged to e roof downspout iniiltration system per City of Everett <br />Storm Manual 3•2.6.2. Width __, Depth _, Length _. <br />10. The contractor must meet with the Public Works Inspector to disaiss potential drainage <br />routing prior to beginning the project. <br />�17�Install erosion control measures as determined by the Pubiic VVorks inspector, such as silt <br />fence, straw bales, swales, or erosion blenkets. <br />12. Install erosion control measures per Ciry of Everett Standards for small parcels <br />13 Remove erosion control measures upon completion of the project prior to final approval of the <br />permit. <br />�/1�4. All excavated material trom foundation, sidowalk and driveways shell be hauled tu an <br />v approved, permitted site. No wasting o( material is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per Ciry of Everett Stenderd Plan #'s 305A <br />& 306 or this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />16. Install a Type I concrete driveway per City of Everett Standard #307. <br />17. Pave driveway from the front property line out to the street peving. <br />18. Contact the Water District for connecting provisions for this building's <br />water and sewer services. <br />79. A catch basin ar� per City Standard Plan #402 with a gas trap per 5tandard Plen #410 is <br />required tor the parking area. <br />20. If a sewer pump system �s to be installed, the pressure line must discherge into a private <br />manhole, then gravity flow across the public right-of-way. <br />2� . A sprinkler system is required tor this building in compliance with the requirements of NFDA <br />Star�ards 13D. <br />PWCanmar.f5 <br />