My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2506 97TH PL SE 2016-01-01 MF Import
>
Address Records
>
97TH PL SE
>
2506
>
2506 97TH PL SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 9:37:44 PM
Creation date
4/14/2017 1:16:32 PM
Metadata
Fields
Template:
Address Document
Street Name
97TH PL SE
Street Number
2506
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Conne:t side sewer per Gity Standard #i601. <br />6�. Con iect side sewer per Ciry Standard #'S 601, 602, 6Q4. <br />7. Connect all rooftop downspouts to the side sewer. <br />%b.)Connect rooftop downspouts to tha drainage system provided for fh� ._.. <br />l/ <br />9. Rooftop runoft must be discharged to e rooi downspout infiltration system per City ol Everett <br />Storm Manual 3•2.6.2. Width _, Depth _, Length _, <br />10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />11, Install erosion control measures as determined by the Public'�`�orks inspector, such es silt <br />fence, straw bales, swales, or erosion blankets. <br />12. Install erosion control measures per City ot Everett Standards for small parcels <br />j13�Remove erosion control meesures upon completion of the project prior to final approval oi the <br />' permit. <br />14 All excavated materiel from foundation, sidewalk and driveways shall be hauled to an <br />approved, permitled site. No wasting ol material is ali�wed on this building lot. <br />15. Remove and replace curb, gu:ter and sidewalk as per City of Everett Standard Plan #'s 305A <br />8 306 on ihis proposal's frontage as directed by the Pubiic Works Inspector (i.e. alI unused <br />driveways and any broken or damaged area must be replar,ed). <br />16. Install a Type I concrete drivewey per City of Everett Standard #307. <br />17. Pave driveway trom the front property line out to the street paving. <br />18. Contact tha Water District for connecting provisions for this building's <br />water and sewer services. <br />19. A catch basin as per City Standard Plan #402 with a gas trap per Standar� Plan #410 is <br />required fnr the parking area. <br />20. If a sewer pump system �s to be installed, the pressure line must dischary� into a private <br />manhole, then gravity flow across the pubiic �ight-of-way. <br />21. A sprinkler system is reqwred for this building in compliance with the requirernents of NFDA <br />Standards 13D. <br />PWCommenls �d' <br />
The URL can be used to link to this page
Your browser does not support the video tag.